# Greenacres Caravan Park

Web page: https://ampmap.co.uk/charger/greenacres-caravan-park-uk

Greenacres Caravan Park is an EV charging site in Prestatyn, Denbighshire, run by Greenacres Caravan Park and open 24 hours a day. Its 2 sockets reach up to 22 kW, with Type 2 at the top speed. Recorded live status shows it is usually busiest around 7 pm, and Amp Map measured 100% uptime and recorded 41 charging sessions here over the last 30 days.

## Status

2 of 2 open at 22 Nov 2026, 16:40 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** 0 Shore Rd, LL19 9SS
- **Area:** Prestatyn, Denbighshire, United Kingdom
- **Coordinates (latitude, longitude):** 53.34374, -3.36748

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 22 kW | 1 | Not listed | 1 free |
| Type 2 | 7 kW | 1 | Not listed | 1 free |

## Site information

- **Operator:** Greenacres Caravan Park
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Greenacres Caravan Park?

Up to 22 kW AC via Type 2.

### How many charging sockets does Greenacres Caravan Park have?

2 charging sockets: 1 × 7 kW Type 2, 1 × 22 kW Type 2. Live per-socket availability is shown on this page.

### Is Greenacres Caravan Park open 24/7?

Yes - Greenacres Caravan Park is open 24 hours a day, 7 days a week.

### When is Greenacres Caravan Park busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 7 pm and quietest around 4 pm. The live status on this page shows what is free before you set off.

### How reliable is Greenacres Caravan Park?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 41 observed charging sessions.

### Who operates Greenacres Caravan Park?

Greenacres Caravan Park is on the Greenacres Caravan Park network.

### How long does a Tesla Model Y Long Range take to charge at Greenacres Caravan Park?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Greenacres Caravan Park?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Greenacres Caravan Park?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Prestatyn](https://ampmap.co.uk/chargers/united-kingdom/denbighshire/prestatyn)

## Chargers near this site

- [Fern Lane · Evolt](https://ampmap.co.uk/charger/evolt-network-fern-lane-uk) - Type 2 7 kW · Fern Lane
- [Kings' Avenue · Evolt](https://ampmap.co.uk/charger/evolt-network-kings-avenue-uk) - CCS 51 kW, CHAdeMO 51 kW · Kings' Avenue

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/greenacres-caravan-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Greenacres Caravan Park (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
