Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

GRIDSERVE · EV charging site

HU - Dobbies Dunfermline

Fife Leisure Park, Dunfermline, KY11 8EX

HU - Dobbies Dunfermline is an EV charging site in Dunfermline, Fife, run by GRIDSERVE and open Mon–Sun 07:00–18:30. Its 12 sockets reach up to 180 kW, with CCS at the top speed, and the published price is £0.85 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 50% uptime and recorded 730 charging sessions here over the last 30 days. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Starbucks Dunfermline - 0179 (FOR EV), 170 yards away.

Status

9 of 12 available

Checking status…

VerifiedLive status and details from GRIDSERVE’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 180 kW10 connectors · 85p per kWh8 free2 in use
#152% reliabilityAvailable
#346% reliabilityCharging
#450% reliabilityAvailable
#554% reliabilityAvailable
#658% reliabilityAvailable
#751% reliabilityAvailable
#855% reliabilityCharging
#945% reliabilityAvailable
#1152% reliabilityAvailable
#1244% reliabilityAvailable
CHAdeMO · 80 kW2 connectors · 85p per kWh1 free1 in use
#248% reliabilityCharging
#1045% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
GRIDSERVE
Opening hours
Mon–Sun 07:00–18:30
Parking
Car park
Payment
Bank card at the chargerIn the GRIDSERVE appRFID card

Facilities

HotelRestaurantCaféShoppingRecreation

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS180 kW85p per kWh
CHAdeMO80 kW85p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 180 kW CCS~24 min · ≈ 55 kWh · ~£47
Tesla Model 3 Rear-Wheel Drive 10–80% · 180 kW CCS~23 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 180 kW CCS~39 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 180 kW CCS~20 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 180 kW CCS~30 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 180 kW CCS~39 min · ≈ 41 kWh · ~£35
Nissan LEAF 10–80% · 80 kW CHAdeMO~54 min · ≈ 28 kWh · ~£24

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at HU - Dobbies Dunfermline (GRIDSERVE)?

The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at HU - Dobbies Dunfermline (GRIDSERVE)?

Up to 180 kW DC via CCS, CHAdeMO.

How many charging sockets does HU - Dobbies Dunfermline (GRIDSERVE) have?

12 charging sockets: 10 × 180 kW CCS, 2 × 80 kW CHAdeMO. Live per-socket availability is shown on this page.

When is HU - Dobbies Dunfermline (GRIDSERVE) open?

Opening hours: Mon–Sun 07:00–18:30.

When is HU - Dobbies Dunfermline (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is HU - Dobbies Dunfermline (GRIDSERVE)?

Amp Map measured 50% uptime here from recorded live status over the last 30 days, across 730 observed charging sessions.

Who operates HU - Dobbies Dunfermline?

HU - Dobbies Dunfermline is on the GRIDSERVE network.

Where is the nearest other charger with 50 kW or more to HU - Dobbies Dunfermline (GRIDSERVE)?

Starbucks Dunfermline - 0179 (FOR EV) is 170 yards away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at HU - Dobbies Dunfermline (GRIDSERVE)?

A typical 10–80% rapid charge takes about 24 min on the 180 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HU - Dobbies Dunfermline (GRIDSERVE)?

A typical 10–80% rapid charge takes about 23 min on the 180 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at HU - Dobbies Dunfermline (GRIDSERVE)?

A typical 10–80% rapid charge takes about 39 min on the 180 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.