EH - Extra Beaconsfield is an EV charging site in Gerrards Cross, Buckinghamshire, run by GRIDSERVE and open 24 hours a day. Its 19 sockets reach up to 400 kW, with CCS at the top speed, and the published price is £0.92 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 99% uptime and recorded 7843 charging sessions here over the last 30 days.

## Status

6 of 19 open at 22 Nov 2026, 14:08 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** M40 Motorway, Jct 2, HP9 2SE
- **Area:** Gerrards Cross, Buckinghamshire, United Kingdom
- **Coordinates (latitude, longitude):** 51.58792, -0.62639
- **Parking:** On-street
- **Getting there:** Carpark of the Extra to the right

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 400 kW | 12 | £0.92/kWh | 4 free, 8 in use |
| CCS | 50 kW | 4 | £0.92/kWh | 1 free, 2 in use, 1 status unknown |
| CHAdeMO | 50 kW | 2 | £0.92/kWh | 1 free, 1 status unknown |
| Type 2 | 22 kW | 1 | £0.92/kWh | Status unknown |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** GRIDSERVE
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the GRIDSERVE app; RFID card
- **Facilities:** Hotel, Restaurant, Café, Shopping, Supermarket, Recreation, Wi-Fi

## Common questions

### How much does it cost to charge at EH - Extra Beaconsfield (GRIDSERVE)?

The listed price is £0.92/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at EH - Extra Beaconsfield (GRIDSERVE)?

Up to 400 kW DC via CCS, CHAdeMO, Type 2.

### How many charging sockets does EH - Extra Beaconsfield (GRIDSERVE) have?

19 charging sockets: 4 × 50 kW CCS, 2 × 50 kW CHAdeMO, 1 × 22 kW Type 2, 12 × 400 kW CCS. Live per-socket availability is shown on this page.

### Is EH - Extra Beaconsfield (GRIDSERVE) open 24/7?

Yes - EH - Extra Beaconsfield (GRIDSERVE) is open 24 hours a day, 7 days a week.

### When is EH - Extra Beaconsfield (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

### How reliable is EH - Extra Beaconsfield (GRIDSERVE)?

Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 7843 observed charging sessions.

### Who operates EH - Extra Beaconsfield?

EH - Extra Beaconsfield is on the GRIDSERVE network.

### How long does a Tesla Model Y Long Range take to charge at EH - Extra Beaconsfield (GRIDSERVE)?

A typical 10–80% rapid charge takes about 21 min on the 400 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - Extra Beaconsfield (GRIDSERVE)?

A typical 10–80% rapid charge takes about 23 min on the 400 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at EH - Extra Beaconsfield (GRIDSERVE)?

A typical 10–80% rapid charge takes about 39 min on the 400 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Gerrards Cross](https://ampmap.co.uk/chargers/united-kingdom/buckinghamshire/gerrards-cross)
- [GRIDSERVE chargers](https://ampmap.co.uk/networks/gridserve)

## Chargers near this site

- [IONITY GmbH IONITY Beaconsfield](https://ampmap.co.uk/charger/ionity-extra-beaconsfield-services-uk) - CCS 350 kW · Beaconsfield Services, M40 Junction 2 · From 89p/kWh
- [The Great Barn Right · ChargePoint](https://ampmap.co.uk/charger/chargepoint-the-great-barn-right-uk) - Type 2 22 kW · Woodlands Farm
- [Crowne Plaza Gerrards Cross · Project EV](https://ampmap.co.uk/charger/project-ev-crowne-plaza-gerrards-cross-uk) - CCS 50 kW, Type 2 7 kW · Oxford Road
- [Penncroft Car Park · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-penncroft-car-park-uk) - Type 2 7 kW · Penncroft Car Park, Burkes Road · From 65p/kWh
- [Warwick Road Car Park · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-warwick-road-car-park-uk) - Type 2 7 kW · Warwick Road Car Park · From 65p/kWh
- [Miller & Carter Beaconsfield · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-miller-and-carter-beaconsfield-uk) - CCS 50 kW · Miller & Carter Beaconsfield, Holtspur Top La · From 89p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/gridserve-eh-extra-beaconsfield-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: GRIDSERVE (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.