# EH - MOTO Ferrybridge · GRIDSERVE

Web page: https://ampmap.co.uk/charger/gridserve-eh-moto-ferrybridge-uk

EH - MOTO Ferrybridge is an EV charging site in Pontefract, City and Borough of Wakefield, run by GRIDSERVE and open 24 hours a day. Its 32 sockets reach up to 360 kW, with CCS at the top speed, and the published price is £0.92 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 99% uptime and recorded 6693 charging sessions here over the last 30 days.

## Status

21 of 32 open at 22 Nov 2026, 17:16 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** M62-A1M Jct 33, WF11 0AF
- **Area:** Pontefract, City and Borough of Wakefield, United Kingdom
- **Coordinates (latitude, longitude):** 53.69831, -1.26514
- **Parking:** On-street
- **Getting there:** To the right of entrance to Travelodge building.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 360 kW | 12 | £0.92/kWh | 4 free, 8 in use |
| CCS | 350 kW | 6 | £0.92/kWh | 5 free, 1 in use |
| CCS or CHAdeMO | 350 kW | 6 | £0.92/kWh | 6 free |
| CCS | 50 kW | 4 | £0.92/kWh | 2 free, 2 in use |
| CHAdeMO | 50 kW | 2 | £0.92/kWh | 2 free |
| Type 2 | 22 kW | 2 | £0.92/kWh | 2 free |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** GRIDSERVE
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the GRIDSERVE app; RFID card
- **Facilities:** Hotel, Restaurant, Café, Shopping, Fuel station, Wi-Fi

## Common questions

### How much does it cost to charge at EH - MOTO Ferrybridge (GRIDSERVE)?

The listed price is £0.92/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at EH - MOTO Ferrybridge (GRIDSERVE)?

Up to 360 kW DC via CCS, CHAdeMO, Type 2.

### How many charging sockets does EH - MOTO Ferrybridge (GRIDSERVE) have?

32 charging sockets: 4 × 50 kW CCS, 2 × 50 kW CHAdeMO, 2 × 22 kW Type 2, 12 × 350 kW CCS, 6 × 100 kW CHAdeMO, 12 × 360 kW CCS. Live per-socket availability is shown on this page.

### Is EH - MOTO Ferrybridge (GRIDSERVE) open 24/7?

Yes - EH - MOTO Ferrybridge (GRIDSERVE) is open 24 hours a day, 7 days a week.

### When is EH - MOTO Ferrybridge (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

### How reliable is EH - MOTO Ferrybridge (GRIDSERVE)?

Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 6693 observed charging sessions.

### Who operates EH - MOTO Ferrybridge?

EH - MOTO Ferrybridge is on the GRIDSERVE network.

### How long does a Tesla Model Y Long Range take to charge at EH - MOTO Ferrybridge (GRIDSERVE)?

A typical 10–80% rapid charge takes about 21 min on the 360 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - MOTO Ferrybridge (GRIDSERVE)?

A typical 10–80% rapid charge takes about 23 min on the 360 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at EH - MOTO Ferrybridge (GRIDSERVE)?

A typical 10–80% rapid charge takes about 39 min on the 360 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Pontefract](https://ampmap.co.uk/chargers/united-kingdom/city-and-borough-of-wakefield/pontefract)
- [GRIDSERVE chargers](https://ampmap.co.uk/networks/gridserve)

## Chargers near this site

- [Ferrybridge, UK · Tesla](https://ampmap.co.uk/charger/tesla-ferrybridge-uk-uk) - CCS 250 kW · M62 Motorway · From 26p/kWh
- [Pod Point Premier Inn - Pontefract North](https://ampmap.co.uk/charger/pod-point-premier-inn-pontefract-north-uk) - Type 2 7 kW · A1 Business Park, Pontefract Road Pontefract · From 44.4p/kWh
- [Morrisons Supermarket · MFG EV Power](https://ampmap.co.uk/charger/mfg-ev-power-morrisons-supermarket-uk) - CCS 50 kW · Marine Villa Road
- [Springfield Garage ( Ford Garage ) · MER](https://ampmap.co.uk/charger/mer-springfield-garage-ford-garage-uk) - Type 2 22 kW · 108 Weeland Rd
- [South Baileygate Retail Park, Pontefract · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-south-baileygate-retail-park-uk) - CCS 50 kW, Type 2 16 kW · Baileygate Industrial Estate, S Baileygate · From 89p/kWh
- [Stuart Road car Park (2) · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-stuart-road-car-park-2-uk) - CCS 50 kW, CHAdeMO 50 kW · Stuart Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/gridserve-eh-moto-ferrybridge-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: GRIDSERVE (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
