GRIDSERVE · EV charging site
EH - MOTO Leigh Delamere Westbound
M4 Westbound Between Junction 17 and 18, Chippenham, SN14 6LB
EH - MOTO Leigh Delamere Westbound is an EV charging site in Chippenham, Wiltshire, run by GRIDSERVE and open 24 hours a day. Its 26 sockets reach up to 400 kW, with CCS at the top speed, and published prices run from £0.59 to £0.92 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 5626 charging sessions here over the last 30 days. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Leigh Delamere, UK - Westbound (Tesla), 20 yards away.
Status
19 of 26 available
Checking status…
Connectors
CCS · 400 kW
CCS · 360 kW
CCS · 350 kW
CCS or CHAdeMO · 350 kW
CCS · 40 kW
CHAdeMO · 40 kW
Type 2 · 11 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- GRIDSERVE
- Opening hours
- Open 24 hours
- Parking
- On-street
- Payment
- Bank card at the chargerIn the GRIDSERVE appRFID card
- Getting there
- M4 Westbound Between Junction 17 and 18, Right Hand Side of Main Building
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 400 kW | 92p per kWh |
| CCS | 360 kW | 92p per kWh |
| CCS | 350 kW | 92p per kWh |
| CHAdeMO | 100 kW | 92p per kWh |
| CCS | 40 kW | 92p per kWh |
| CHAdeMO | 40 kW | 92p per kWh |
| Type 2 | 11 kW | 59p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at EH - MOTO Leigh Delamere Westbound (GRIDSERVE)?
The listed price is CCS £0.92/kWh · CHAdeMO £0.92/kWh · CCS £0.92/kWh · CHAdeMO £0.92/kWh · Type 2 £0.59/kWh · CCS £0.92/kWh · CCS £0.92/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at EH - MOTO Leigh Delamere Westbound (GRIDSERVE)?
Up to 400 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does EH - MOTO Leigh Delamere Westbound (GRIDSERVE) have?
26 charging sockets: 1 × 40 kW CCS, 1 × 40 kW CHAdeMO, 12 × 350 kW CCS, 3 × 100 kW CHAdeMO, 2 × 11 kW Type 2, 6 × 360 kW CCS, 4 × 400 kW CCS. Live per-socket availability is shown on this page.
Is EH - MOTO Leigh Delamere Westbound (GRIDSERVE) open 24/7?
Yes - EH - MOTO Leigh Delamere Westbound (GRIDSERVE) is open 24 hours a day, 7 days a week.
When is EH - MOTO Leigh Delamere Westbound (GRIDSERVE) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is EH - MOTO Leigh Delamere Westbound (GRIDSERVE)?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 5626 observed charging sessions.
Who operates EH - MOTO Leigh Delamere Westbound?
EH - MOTO Leigh Delamere Westbound is on the GRIDSERVE network.
Where is the nearest other charger with 50 kW or more to EH - MOTO Leigh Delamere Westbound (GRIDSERVE)?
Leigh Delamere, UK - Westbound (Tesla) is 20 yards away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at EH - MOTO Leigh Delamere Westbound (GRIDSERVE)?
A typical 10–80% rapid charge takes about 21 min on the 400 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - MOTO Leigh Delamere Westbound (GRIDSERVE)?
A typical 10–80% rapid charge takes about 23 min on the 400 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EH - MOTO Leigh Delamere Westbound (GRIDSERVE)?
A typical 10–80% rapid charge takes about 39 min on the 400 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.