GRIDSERVE · EV charging site
EH - MOTO Reading Eastbound
M4, Reading, RG30 3UQ
EH - MOTO Reading Eastbound is an EV charging site in Reading, run by GRIDSERVE and open 24 hours a day. Its 36 sockets reach up to 360 kW, with CCS at the top speed, and published prices run from £0.59 to £0.89 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 99% uptime and recorded 5910 charging sessions here over the last 30 days. 12 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is MOT4400201 (Moto Hospitality), 160 yards away.
Status
26 of 36 available
Checking status…
Connectors
CCS · 360 kW
CCS · 350 kW
CHAdeMO · 100 kW
CCS · 40 kW
CHAdeMO · 40 kW
Type 2 · 11 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- GRIDSERVE
- Opening hours
- Open 24 hours
- Parking
- On-street
- Payment
- Bank card at the chargerIn the GRIDSERVE appRFID card
- Getting there
- Turn left at the entrance of Greggs and the chargers are a short distance ahead.
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 360 kW | 89p per kWh |
| CCS | 350 kW | 89p per kWh |
| CHAdeMO | 100 kW | 89p per kWh |
| CCS | 40 kW | 89p per kWh |
| CHAdeMO | 40 kW | 89p per kWh |
| Type 2 | 11 kW | 59p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at EH - MOTO Reading Eastbound (GRIDSERVE)?
The listed price is CCS £0.89/kWh · CHAdeMO £0.89/kWh · CCS £0.89/kWh · CHAdeMO £0.89/kWh · Type 2 £0.59/kWh · CCS £0.89/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at EH - MOTO Reading Eastbound (GRIDSERVE)?
Up to 360 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does EH - MOTO Reading Eastbound (GRIDSERVE) have?
36 charging sockets: 3 × 40 kW CCS, 1 × 40 kW CHAdeMO, 12 × 350 kW CCS, 6 × 100 kW CHAdeMO, 2 × 11 kW Type 2, 12 × 360 kW CCS. Live per-socket availability is shown on this page.
Is EH - MOTO Reading Eastbound (GRIDSERVE) open 24/7?
Yes - EH - MOTO Reading Eastbound (GRIDSERVE) is open 24 hours a day, 7 days a week.
When is EH - MOTO Reading Eastbound (GRIDSERVE) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is EH - MOTO Reading Eastbound (GRIDSERVE)?
Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 5910 observed charging sessions.
Who operates EH - MOTO Reading Eastbound?
EH - MOTO Reading Eastbound is on the GRIDSERVE network.
Where is the nearest other charger with 50 kW or more to EH - MOTO Reading Eastbound (GRIDSERVE)?
MOT4400201 (Moto Hospitality) is 160 yards away in a straight line, with up to 400 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at EH - MOTO Reading Eastbound (GRIDSERVE)?
A typical 10–80% rapid charge takes about 21 min on the 360 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - MOTO Reading Eastbound (GRIDSERVE)?
A typical 10–80% rapid charge takes about 23 min on the 360 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EH - MOTO Reading Eastbound (GRIDSERVE)?
A typical 10–80% rapid charge takes about 39 min on the 360 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- MOT4400204 · 400 kW · 160 yd