# eHGV - MOTO Exeter · GRIDSERVE Electric Freightway

Web page: https://ampmap.co.uk/charger/gridserve-electric-freightway-ehgv-moto-exeter-uk

eHGV - MOTO Exeter is an EV charging site in Heavitree, Devon, run by GRIDSERVE Electric Freightway and open 24 hours a day. Its 10 sockets reach up to 350 kW, with CCS at the top speed, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 11 pm, and Amp Map measured 100% uptime and recorded 15 charging sessions here over the last 30 days.

## Status

10 of 10 open at 22 Nov 2026, 19:48 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Moor lane, EX2 7HF
- **Area:** Heavitree, Devon, United Kingdom
- **Coordinates (latitude, longitude):** 50.71723, -3.46321
- **Parking:** On-street

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 350 kW | 9 | £0.89/kWh | 9 free |
| CHAdeMO | 100 kW | 1 | £0.89/kWh | 1 free |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** GRIDSERVE Electric Freightway
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the GRIDSERVE app; RFID card
- **Facilities:** Restaurant, Café, Supermarket, Fuel station, Wi-Fi

## Common questions

### How much does it cost to charge at eHGV - MOTO Exeter (GRIDSERVE Electric Freightway)?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at eHGV - MOTO Exeter (GRIDSERVE Electric Freightway)?

Up to 350 kW DC via CCS, CHAdeMO.

### How many charging sockets does eHGV - MOTO Exeter (GRIDSERVE Electric Freightway) have?

10 charging sockets: 9 × 350 kW CCS, 1 × 100 kW CHAdeMO. Live per-socket availability is shown on this page.

### Is eHGV - MOTO Exeter (GRIDSERVE Electric Freightway) open 24/7?

Yes - eHGV - MOTO Exeter (GRIDSERVE Electric Freightway) is open 24 hours a day, 7 days a week.

### When is eHGV - MOTO Exeter (GRIDSERVE Electric Freightway) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is eHGV - MOTO Exeter (GRIDSERVE Electric Freightway)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 15 observed charging sessions.

### Who operates eHGV - MOTO Exeter?

eHGV - MOTO Exeter is on the GRIDSERVE Electric Freightway network.

### How long does a Tesla Model Y Long Range take to charge at eHGV - MOTO Exeter (GRIDSERVE Electric Freightway)?

A typical 10–80% rapid charge takes about 21 min on the 350 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at eHGV - MOTO Exeter (GRIDSERVE Electric Freightway)?

A typical 10–80% rapid charge takes about 23 min on the 350 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at eHGV - MOTO Exeter (GRIDSERVE Electric Freightway)?

A typical 10–80% rapid charge takes about 39 min on the 350 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Heavitree](https://ampmap.co.uk/chargers/united-kingdom/devon/heavitree)
- [Cheapest charging in Heavitree](https://ampmap.co.uk/chargers/united-kingdom/devon/heavitree/cheapest)
- [GRIDSERVE Electric Freightway chargers](https://ampmap.co.uk/networks/gridserve-electric-freightway)

## Chargers near this site

- [MOT4400404 · Moto Hospitality](https://ampmap.co.uk/charger/moto-hospitality-mot4400404-uk) - CCS 400 kW · 30 Sandygate Roundabout · From 89p/kWh
- [MOT4400405 · Moto Hospitality](https://ampmap.co.uk/charger/moto-hospitality-mot4400405-uk) - CCS 400 kW · 30 Sandygate Roundabout · From 89p/kWh
- [MOT4400414 · Moto Hospitality](https://ampmap.co.uk/charger/moto-hospitality-mot4400414-uk) - CCS 400 kW · 30 Sandygate Roundabout · From 89p/kWh
- [MOT4400419 · Moto Hospitality](https://ampmap.co.uk/charger/moto-hospitality-mot4400419-uk) - CCS 400 kW · 30 Sandygate Roundabout · From 89p/kWh
- [MOT4400403 · Moto Hospitality](https://ampmap.co.uk/charger/moto-hospitality-mot4400403-uk) - CCS 400 kW · 30 Sandygate Roundabout · From 89p/kWh
- [MOT4400411 · Moto Hospitality](https://ampmap.co.uk/charger/moto-hospitality-mot4400411-uk) - CCS 400 kW · 30 Sandygate Roundabout · From 89p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/gridserve-electric-freightway-ehgv-moto-exeter-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: GRIDSERVE (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
