GRIDSERVE Electric Freightway · EV charging site
eHGV - MOTO Tamworth
Green Lane, Tamworth, B77 5PS
eHGV - MOTO Tamworth is an EV charging site in Tamworth, Staffordshire, run by GRIDSERVE Electric Freightway and open 24 hours a day. All 12 of its sockets are 350 kW CCS, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 6 pm, and Amp Map measured 100% uptime and recorded 36 charging sessions here over the last 30 days. 14 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is EH - MOTO Tamworth (GRIDSERVE), 0.1 miles away.
Status
11 of 12 available
Checking status…
Connectors
CCS · 350 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- GRIDSERVE Electric Freightway
- Opening hours
- Open 24 hours
- Parking
- On-street
- Payment
- Bank card at the chargerIn the GRIDSERVE appRFID card
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 350 kW | 89p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at eHGV - MOTO Tamworth (GRIDSERVE Electric Freightway)?
The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at eHGV - MOTO Tamworth (GRIDSERVE Electric Freightway)?
Up to 350 kW DC via CCS.
How many charging sockets does eHGV - MOTO Tamworth (GRIDSERVE Electric Freightway) have?
12 charging sockets: 12 × 350 kW CCS. Live per-socket availability is shown on this page.
Is eHGV - MOTO Tamworth (GRIDSERVE Electric Freightway) open 24/7?
Yes - eHGV - MOTO Tamworth (GRIDSERVE Electric Freightway) is open 24 hours a day, 7 days a week.
When is eHGV - MOTO Tamworth (GRIDSERVE Electric Freightway) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 6 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is eHGV - MOTO Tamworth (GRIDSERVE Electric Freightway)?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 36 observed charging sessions.
Who operates eHGV - MOTO Tamworth?
eHGV - MOTO Tamworth is on the GRIDSERVE Electric Freightway network.
Where is the nearest other charger with 50 kW or more to eHGV - MOTO Tamworth (GRIDSERVE Electric Freightway)?
EH - MOTO Tamworth (GRIDSERVE) is 0.1 miles away in a straight line, with up to 360 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at eHGV - MOTO Tamworth (GRIDSERVE Electric Freightway)?
A typical 10–80% rapid charge takes about 21 min on the 350 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at eHGV - MOTO Tamworth (GRIDSERVE Electric Freightway)?
A typical 10–80% rapid charge takes about 23 min on the 350 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at eHGV - MOTO Tamworth (GRIDSERVE Electric Freightway)?
A typical 10–80% rapid charge takes about 39 min on the 350 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- EH - MOTO Tamworth · 59p per kWh · 360 kW · 0.1 mi
- Fastest nearby
- MOT4400304 · 400 kW · 0.1 mi