Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

GRIDSERVE · EV charging site

HU - Centaurus Retail Park

Centaurus Retail Park, Mangotsfield, BS34 5TS

HU - Centaurus Retail Park is an EV charging site in Mangotsfield, South Gloucestershire, run by GRIDSERVE and open 24 hours a day. All 8 of its sockets are 400 kW CCS, and the published price is £0.85 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 100% uptime and recorded 1290 charging sessions here over the last 30 days. 17 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Bristol, UK - Cribbs Causeway (Tesla), 130 yards away.

Status

1 of 8 available

Checking status…

VerifiedLive status and details from GRIDSERVE’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 400 kW8 connectors · 85p per kWh1 free7 in use
#1100% reliabilityCharging
#2100% reliabilityAvailable
#3100% reliabilityCharging
#4100% reliabilityCharging
#5100% reliabilityCharging
#6100% reliabilityCharging
#7100% reliabilityCharging
#8100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
GRIDSERVE
Opening hours
Open 24 hours
Parking
On-street
Payment
Bank card at the chargerIn the GRIDSERVE appRFID card

Facilities

Shopping

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS400 kW85p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 400 kW CCS~21 min · ≈ 55 kWh · ~£47
Tesla Model 3 Rear-Wheel Drive 10–80% · 400 kW CCS~23 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 400 kW CCS~39 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 400 kW CCS~18 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 400 kW CCS~30 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 400 kW CCS~39 min · ≈ 41 kWh · ~£35

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at HU - Centaurus Retail Park (GRIDSERVE)?

The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at HU - Centaurus Retail Park (GRIDSERVE)?

Up to 400 kW DC via CCS.

How many charging sockets does HU - Centaurus Retail Park (GRIDSERVE) have?

8 charging sockets: 8 × 400 kW CCS. Live per-socket availability is shown on this page.

Is HU - Centaurus Retail Park (GRIDSERVE) open 24/7?

Yes - HU - Centaurus Retail Park (GRIDSERVE) is open 24 hours a day, 7 days a week.

When is HU - Centaurus Retail Park (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is HU - Centaurus Retail Park (GRIDSERVE)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 1290 observed charging sessions.

Who operates HU - Centaurus Retail Park?

HU - Centaurus Retail Park is on the GRIDSERVE network.

Where is the nearest other charger with 50 kW or more to HU - Centaurus Retail Park (GRIDSERVE)?

Bristol, UK - Cribbs Causeway (Tesla) is 130 yards away in a straight line, with up to 250 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at HU - Centaurus Retail Park (GRIDSERVE)?

A typical 10–80% rapid charge takes about 21 min on the 400 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HU - Centaurus Retail Park (GRIDSERVE)?

A typical 10–80% rapid charge takes about 23 min on the 400 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at HU - Centaurus Retail Park (GRIDSERVE)?

A typical 10–80% rapid charge takes about 39 min on the 400 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.