GRIDSERVE · EV charging site
HU - Mayflower Retail Park
Mayflower Retail Park, Basildon, SS14 3HZ
HU - Mayflower Retail Park is an EV charging site in Basildon, Essex, run by GRIDSERVE and open 24 hours a day. All 12 of its sockets are 400 kW CCS, and the published price is £0.85 per kWh. Recorded live status shows it is usually busiest around 9 am, and Amp Map measured 99% uptime and recorded 898 charging sessions here over the last 30 days. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is East Mayne SF Connect (BP Pulse), 0.8 miles away.
Status
12 of 12 available
Checking status…
Connectors
CCS · 400 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- GRIDSERVE
- Opening hours
- Open 24 hours
- Parking
- On-street
- Payment
- Bank card at the chargerIn the GRIDSERVE appRFID card
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 400 kW | 85p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at HU - Mayflower Retail Park (GRIDSERVE)?
The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at HU - Mayflower Retail Park (GRIDSERVE)?
Up to 400 kW DC via CCS.
How many charging sockets does HU - Mayflower Retail Park (GRIDSERVE) have?
12 charging sockets: 12 × 400 kW CCS. Live per-socket availability is shown on this page.
Is HU - Mayflower Retail Park (GRIDSERVE) open 24/7?
Yes - HU - Mayflower Retail Park (GRIDSERVE) is open 24 hours a day, 7 days a week.
When is HU - Mayflower Retail Park (GRIDSERVE) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 9 am and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is HU - Mayflower Retail Park (GRIDSERVE)?
Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 898 observed charging sessions.
Who operates HU - Mayflower Retail Park?
HU - Mayflower Retail Park is on the GRIDSERVE network.
Where is the nearest other charger with 50 kW or more to HU - Mayflower Retail Park (GRIDSERVE)?
East Mayne SF Connect (BP Pulse) is 0.8 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at HU - Mayflower Retail Park (GRIDSERVE)?
A typical 10–80% rapid charge takes about 21 min on the 400 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HU - Mayflower Retail Park (GRIDSERVE)?
A typical 10–80% rapid charge takes about 23 min on the 400 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at HU - Mayflower Retail Park (GRIDSERVE)?
A typical 10–80% rapid charge takes about 39 min on the 400 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Tesco Extra - Basildon
- Mtp Basildon 01
- East Mayne SF Connect
- Basildon Sporting Village
- Basildon District Council - Works Depot
- Miles Gray Road
- Cheapest nearby
- Pod Point Tesco Extra - Basildon · 44.4p per kWh · 7 kW · 0.2 mi