Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

GRIDSERVE · EV charging site

EH - IKEA Warrington

Europa Blvd 910, Great Sankey, WA5 7TY

EH - IKEA Warrington is an EV charging site in Great Sankey, Warrington, run by GRIDSERVE and open 24 hours a day. Its 5 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and the published price is £0.85 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 100% uptime and recorded 517 charging sessions here over the last 30 days. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Skymaster, Warrington (Osprey Charging), 0.5 miles away.

Status

3 of 5 available

Checking status…

VerifiedLive status and details from GRIDSERVE’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 50 kW3 connectors · 85p per kWh1 free2 in use
#1100% reliabilityAvailable
#4100% reliabilityCharging
#5100% reliabilityCharging
CHAdeMO · 50 kW1 connector · 85p per kWh1 free
#2100% reliabilityAvailable
Type 2 · 22 kW1 connector · 85p per kWh1 free
#3100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
GRIDSERVE
Opening hours
Open 24 hours
Parking
On-street
Payment
Bank card at the chargerIn the GRIDSERVE appRFID card

Facilities

RestaurantCaféShoppingSupermarketBus stopWi-Fi

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS50 kW85p per kWh
CHAdeMO50 kW85p per kWh
Type 222 kW85p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£47
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£35
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£24

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at EH - IKEA Warrington (GRIDSERVE)?

The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at EH - IKEA Warrington (GRIDSERVE)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does EH - IKEA Warrington (GRIDSERVE) have?

5 charging sockets: 3 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is EH - IKEA Warrington (GRIDSERVE) open 24/7?

Yes - EH - IKEA Warrington (GRIDSERVE) is open 24 hours a day, 7 days a week.

When is EH - IKEA Warrington (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 9 am. The live status on this page shows what is free before you set off.

How reliable is EH - IKEA Warrington (GRIDSERVE)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 517 observed charging sessions.

Who operates EH - IKEA Warrington?

EH - IKEA Warrington is on the GRIDSERVE network.

Where is the nearest other charger with 50 kW or more to EH - IKEA Warrington (GRIDSERVE)?

Skymaster, Warrington (Osprey Charging) is 0.5 miles away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at EH - IKEA Warrington (GRIDSERVE)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - IKEA Warrington (GRIDSERVE)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at EH - IKEA Warrington (GRIDSERVE)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.