GRIDSERVE · EV charging site
EH - MOTO Doncaster North
Travelodge, Thorne, DN8 5GS
EH - MOTO Doncaster North is an EV charging site in Thorne, Doncaster, run by GRIDSERVE and open 24 hours a day. Its 4 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and published prices run from £0.59 to £0.92 per kWh. Recorded live status shows it is usually busiest around 6 pm, and Amp Map measured 92% uptime and recorded 93 charging sessions here over the last 30 days. 8 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is MOT4400504 (Moto Hospitality), 70 yards away.
Status
4 of 4 available
Checking status…
Connectors
CCS · 50 kW
CHAdeMO · 50 kW
Type 2 · 11 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- GRIDSERVE
- Opening hours
- Open 24 hours
- Parking
- On-street
- Payment
- Bank card at the chargerIn the GRIDSERVE appRFID card
- Getting there
- M18 junction 5
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 50 kW | 92p per kWh |
| CHAdeMO | 50 kW | 92p per kWh |
| Type 2 | 11 kW | 59p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at EH - MOTO Doncaster North (GRIDSERVE)?
The listed price is CCS £0.92/kWh · CHAdeMO £0.92/kWh · Type 2 £0.59/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at EH - MOTO Doncaster North (GRIDSERVE)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does EH - MOTO Doncaster North (GRIDSERVE) have?
4 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 2 × 11 kW Type 2. Live per-socket availability is shown on this page.
Is EH - MOTO Doncaster North (GRIDSERVE) open 24/7?
Yes - EH - MOTO Doncaster North (GRIDSERVE) is open 24 hours a day, 7 days a week.
When is EH - MOTO Doncaster North (GRIDSERVE) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 6 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is EH - MOTO Doncaster North (GRIDSERVE)?
Amp Map measured 92% uptime here from recorded live status over the last 30 days, across 93 observed charging sessions.
Who operates EH - MOTO Doncaster North?
EH - MOTO Doncaster North is on the GRIDSERVE network.
Where is the nearest other charger with 50 kW or more to EH - MOTO Doncaster North (GRIDSERVE)?
MOT4400504 (Moto Hospitality) is 70 yards away in a straight line, with up to 400 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at EH - MOTO Doncaster North (GRIDSERVE)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - MOTO Doncaster North (GRIDSERVE)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EH - MOTO Doncaster North (GRIDSERVE)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- MOT4400502 · 400 kW · 70 yd