Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

GRIDSERVE · EV charging site

EH - MOTO Heston Westbound

Phoenix Way, Heston, TW5 9NB

EH - MOTO Heston Westbound is an EV charging site in Heston, Greater London, run by GRIDSERVE and open 24 hours a day. Its 11 sockets reach up to 350 kW, with CCS at the top speed, and the published price is £0.92 per kWh. Recorded live status shows it is usually busiest around 3 pm, and Amp Map measured 100% uptime and recorded 2172 charging sessions here over the last 30 days. 21 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Heston, UK - Westbound (Tesla), 20 yards away.

Status

9 of 11 available

Checking status…

VerifiedLive status and details from GRIDSERVE’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 350 kW6 connectors · 92p per kWh4 free1 in use1 status unknown
#1100% reliabilityCharging
#2100% reliabilityAvailable
#3100% reliabilityAvailable
#4100% reliabilityAvailable
#599% reliabilityStatus unknown
#11100% reliabilityAvailable
CCS or CHAdeMO · 350 kW5 connectors · 92p per kWh5 free
#6100% reliabilityAvailable
#7100% reliabilityAvailable
#8100% reliabilityAvailable
#9100% reliabilityAvailable
#10100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
GRIDSERVE
Opening hours
Open 24 hours
Parking
On-street
Payment
Bank card at the chargerIn the GRIDSERVE appRFID card

Facilities

RestaurantCaféShoppingSupermarketFuel stationWi-Fi

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS350 kW92p per kWh
CHAdeMO100 kW92p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 350 kW CCS~21 min · ≈ 55 kWh · ~£51
Tesla Model 3 Rear-Wheel Drive 10–80% · 350 kW CCS~23 min · ≈ 40 kWh · ~£37
Audi Q4 e-tron 50 10–80% · 350 kW CCS~39 min · ≈ 51 kWh · ~£47
Hyundai IONIQ 5 10–80% · 350 kW CCS~18 min · ≈ 51 kWh · ~£47
MG Motor MG4 Trophy 10–80% · 350 kW CCS~30 min · ≈ 43 kWh · ~£39
Hyundai Kona Electric Long Range 10–80% · 350 kW CCS~39 min · ≈ 41 kWh · ~£37
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min · ≈ 28 kWh · ~£26

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at EH - MOTO Heston Westbound (GRIDSERVE)?

The listed price is £0.92/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at EH - MOTO Heston Westbound (GRIDSERVE)?

Up to 350 kW DC via CCS, CHAdeMO.

How many charging sockets does EH - MOTO Heston Westbound (GRIDSERVE) have?

11 charging sockets: 11 × 350 kW CCS, 5 × 100 kW CHAdeMO. Live per-socket availability is shown on this page.

Is EH - MOTO Heston Westbound (GRIDSERVE) open 24/7?

Yes - EH - MOTO Heston Westbound (GRIDSERVE) is open 24 hours a day, 7 days a week.

When is EH - MOTO Heston Westbound (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is EH - MOTO Heston Westbound (GRIDSERVE)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 2172 observed charging sessions.

Who operates EH - MOTO Heston Westbound?

EH - MOTO Heston Westbound is on the GRIDSERVE network.

Where is the nearest other charger with 50 kW or more to EH - MOTO Heston Westbound (GRIDSERVE)?

Heston, UK - Westbound (Tesla) is 20 yards away in a straight line, with up to 250 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at EH - MOTO Heston Westbound (GRIDSERVE)?

A typical 10–80% rapid charge takes about 21 min on the 350 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - MOTO Heston Westbound (GRIDSERVE)?

A typical 10–80% rapid charge takes about 23 min on the 350 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at EH - MOTO Heston Westbound (GRIDSERVE)?

A typical 10–80% rapid charge takes about 39 min on the 350 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.