Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

GRIDSERVE · EV charging site

EH - MOTO Sawtry

Toll Bar Way, Great North Road, Huntingdon, PE28 5XW

EH - MOTO Sawtry is an EV charging site in Huntingdon, Cambridgeshire, run by GRIDSERVE and open 24 hours a day. All 12 of its sockets are 360 kW CCS, and the published price is £0.92 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 99% uptime and recorded 2074 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Pod Point Tesco Extra - Huntingdon, 6.4 miles away.

Status

8 of 12 available

Checking status…

VerifiedLive status and details from GRIDSERVE’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 360 kW12 connectors · 92p per kWh8 free2 in use2 status unknown
#1100% reliabilityAvailable
#2100% reliabilityCharging
#3100% reliabilityAvailable
#498% reliabilityAvailable
#5100% reliabilityAvailable
#6100% reliabilityCharging
#798% reliabilityAvailable
#899% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
GRIDSERVE
Opening hours
Open 24 hours
Parking
On-street
Payment
Bank card at the chargerIn the GRIDSERVE appRFID card

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS360 kW92p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 360 kW CCS~21 min · ≈ 55 kWh · ~£51
Tesla Model 3 Rear-Wheel Drive 10–80% · 360 kW CCS~23 min · ≈ 40 kWh · ~£37
Audi Q4 e-tron 50 10–80% · 360 kW CCS~39 min · ≈ 51 kWh · ~£47
Hyundai IONIQ 5 10–80% · 360 kW CCS~18 min · ≈ 51 kWh · ~£47
MG Motor MG4 Trophy 10–80% · 360 kW CCS~30 min · ≈ 43 kWh · ~£39
Hyundai Kona Electric Long Range 10–80% · 360 kW CCS~39 min · ≈ 41 kWh · ~£37

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at EH - MOTO Sawtry (GRIDSERVE)?

The listed price is £0.92/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at EH - MOTO Sawtry (GRIDSERVE)?

Up to 360 kW DC via CCS.

How many charging sockets does EH - MOTO Sawtry (GRIDSERVE) have?

12 charging sockets: 12 × 360 kW CCS. Live per-socket availability is shown on this page.

Is EH - MOTO Sawtry (GRIDSERVE) open 24/7?

Yes - EH - MOTO Sawtry (GRIDSERVE) is open 24 hours a day, 7 days a week.

When is EH - MOTO Sawtry (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is EH - MOTO Sawtry (GRIDSERVE)?

Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 2074 observed charging sessions.

Who operates EH - MOTO Sawtry?

EH - MOTO Sawtry is on the GRIDSERVE network.

Where is the nearest other charger with 50 kW or more to EH - MOTO Sawtry (GRIDSERVE)?

Pod Point Tesco Extra - Huntingdon is 6.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at EH - MOTO Sawtry (GRIDSERVE)?

A typical 10–80% rapid charge takes about 21 min on the 360 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - MOTO Sawtry (GRIDSERVE)?

A typical 10–80% rapid charge takes about 23 min on the 360 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at EH - MOTO Sawtry (GRIDSERVE)?

A typical 10–80% rapid charge takes about 39 min on the 360 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.