GRIDSERVE · EV charging site
EH - MOTO Southwaite Southbound
M6 Southbound, Carlisle, CA4 0NT
EH - MOTO Southwaite Southbound is an EV charging site in Carlisle, Cumbria, run by GRIDSERVE and open 24 hours a day. Its 10 sockets reach up to 142 kW, with CCS at the top speed, and the published price is £0.92 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 99% uptime and recorded 1609 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is EH - MOTO Southwaite Northbound (GRIDSERVE), 0.1 miles away.
Status
7 of 10 available
Checking status…
Connectors
CCS · 142 kW
CCS · 50 kW
CHAdeMO · 50 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- GRIDSERVE
- Opening hours
- Open 24 hours
- Parking
- On-street
- Payment
- Bank card at the chargerIn the GRIDSERVE appRFID card
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 142 kW | 92p per kWh |
| CCS | 50 kW | 92p per kWh |
| CHAdeMO | 50 kW | 92p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at EH - MOTO Southwaite Southbound (GRIDSERVE)?
The listed price is £0.92/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at EH - MOTO Southwaite Southbound (GRIDSERVE)?
Up to 142 kW DC via CCS, CHAdeMO.
How many charging sockets does EH - MOTO Southwaite Southbound (GRIDSERVE) have?
10 charging sockets: 3 × 50 kW CCS, 1 × 50 kW CHAdeMO, 6 × 142 kW CCS. Live per-socket availability is shown on this page.
Is EH - MOTO Southwaite Southbound (GRIDSERVE) open 24/7?
Yes - EH - MOTO Southwaite Southbound (GRIDSERVE) is open 24 hours a day, 7 days a week.
When is EH - MOTO Southwaite Southbound (GRIDSERVE) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is EH - MOTO Southwaite Southbound (GRIDSERVE)?
Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 1609 observed charging sessions.
Who operates EH - MOTO Southwaite Southbound?
EH - MOTO Southwaite Southbound is on the GRIDSERVE network.
Where is the nearest other charger with 50 kW or more to EH - MOTO Southwaite Southbound (GRIDSERVE)?
EH - MOTO Southwaite Northbound (GRIDSERVE) is 0.1 miles away in a straight line, with up to 142 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at EH - MOTO Southwaite Southbound (GRIDSERVE)?
A typical 10–80% rapid charge takes about 28 min on the 142 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - MOTO Southwaite Southbound (GRIDSERVE)?
A typical 10–80% rapid charge takes about 24 min on the 142 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EH - MOTO Southwaite Southbound (GRIDSERVE)?
A typical 10–80% rapid charge takes about 39 min on the 142 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- EH - MOTO Southwaite Northbound · 59p per kWh · 142 kW · 0.1 mi