Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

GRIDSERVE · EV charging site

HU - Solstice Park

Solstice Park PLOT BW3, Salisbury, SP4 7SQ

HU - Solstice Park is an EV charging site in Salisbury, Wiltshire, run by GRIDSERVE and open 24 hours a day. Its 16 sockets reach up to 350 kW, with CCS at the top speed, and the published price is £0.85 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 100% uptime and recorded 3930 charging sessions here over the last 30 days. 7 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Instavolt McDonald's Solstice Park (InstaVolt Ltd), 130 yards away.

Status

7 of 16 available

Checking status…

VerifiedLive status and details from GRIDSERVE’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 350 kW4 connectors · 85p per kWh4 in use
#2100% reliabilityCharging
#3100% reliabilityCharging
#4100% reliabilityCharging
#5100% reliabilityCharging
CCS or CHAdeMO · 350 kW4 connectors · 85p per kWh2 free2 in use
#1100% reliabilityCharging
#6100% reliabilityAvailable
#7100% reliabilityAvailable
#8100% reliabilityCharging
CCS · 180 kW8 connectors · 85p per kWh5 free3 in use
#999% reliabilityCharging
#1099% reliabilityAvailable
#11100% reliabilityAvailable
#12100% reliabilityAvailable
#13100% reliabilityAvailable
#14100% reliabilityAvailable
#1599% reliabilityCharging
#16100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
GRIDSERVE
Opening hours
Open 24 hours
Parking
On-street
Payment
Bank card at the chargerIn the GRIDSERVE appRFID card

Facilities

HotelRestaurantCaféFuel station

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS350 kW85p per kWh
CCS180 kW85p per kWh
CHAdeMO100 kW85p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 350 kW CCS~21 min · ≈ 55 kWh · ~£47
Tesla Model 3 Rear-Wheel Drive 10–80% · 350 kW CCS~23 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 350 kW CCS~39 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 350 kW CCS~18 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 350 kW CCS~30 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 350 kW CCS~39 min · ≈ 41 kWh · ~£35
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min · ≈ 28 kWh · ~£24

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at HU - Solstice Park (GRIDSERVE)?

The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at HU - Solstice Park (GRIDSERVE)?

Up to 350 kW DC via CCS, CHAdeMO.

How many charging sockets does HU - Solstice Park (GRIDSERVE) have?

16 charging sockets: 8 × 350 kW CCS, 4 × 100 kW CHAdeMO, 8 × 180 kW CCS. Live per-socket availability is shown on this page.

Is HU - Solstice Park (GRIDSERVE) open 24/7?

Yes - HU - Solstice Park (GRIDSERVE) is open 24 hours a day, 7 days a week.

When is HU - Solstice Park (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is HU - Solstice Park (GRIDSERVE)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 3930 observed charging sessions.

Who operates HU - Solstice Park?

HU - Solstice Park is on the GRIDSERVE network.

Where is the nearest other charger with 50 kW or more to HU - Solstice Park (GRIDSERVE)?

Instavolt McDonald's Solstice Park (InstaVolt Ltd) is 130 yards away in a straight line, with up to 120 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at HU - Solstice Park (GRIDSERVE)?

A typical 10–80% rapid charge takes about 21 min on the 350 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HU - Solstice Park (GRIDSERVE)?

A typical 10–80% rapid charge takes about 23 min on the 350 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at HU - Solstice Park (GRIDSERVE)?

A typical 10–80% rapid charge takes about 39 min on the 350 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.