# Stevenage Electric Forecourt · GRIDSERVE

Web page: https://ampmap.co.uk/charger/gridserve-stevenage-electric-forecourt-uk

Stevenage Electric Forecourt is an EV charging site in Stevenage, Hertfordshire, run by GRIDSERVE and open 24 hours a day. Its 32 sockets reach up to 360 kW, with CCS at the top speed, and published prices run from £0.59 to £0.85 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 4059 charging sessions here over the last 30 days.

## Status

27 of 32 open at 22 Nov 2026, 21:15 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Knebworth Park, A1M, SG1 2AX
- **Area:** Stevenage, Hertfordshire, United Kingdom
- **Coordinates (latitude, longitude):** 51.88792, -0.20865
- **Parking:** On-street

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 360 kW | 24 | £0.85/kWh | 20 free, 4 in use |
| CCS | 24 kW | 2 | £0.59/kWh | 2 free |
| CHAdeMO | 24 kW | 2 | £0.59/kWh | 1 free, 1 in use |
| Type 2 | 22 kW | 4 | £0.59/kWh | 4 free |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** GRIDSERVE
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the GRIDSERVE app; RFID card
- **Facilities:** Café, Supermarket, Wi-Fi

## Common questions

### How much does it cost to charge at Stevenage Electric Forecourt (GRIDSERVE)?

The listed price is CCS £0.85/kWh · CCS £0.59/kWh · CHAdeMO £0.59/kWh · Type 2 £0.59/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Stevenage Electric Forecourt (GRIDSERVE)?

Up to 360 kW DC via CCS, CHAdeMO, Type 2.

### How many charging sockets does Stevenage Electric Forecourt (GRIDSERVE) have?

32 charging sockets: 24 × 360 kW CCS, 2 × 24 kW CCS, 2 × 24 kW CHAdeMO, 4 × 22 kW Type 2. Live per-socket availability is shown on this page.

### Is Stevenage Electric Forecourt (GRIDSERVE) open 24/7?

Yes - Stevenage Electric Forecourt (GRIDSERVE) is open 24 hours a day, 7 days a week.

### When is Stevenage Electric Forecourt (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

### How reliable is Stevenage Electric Forecourt (GRIDSERVE)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 4059 observed charging sessions.

### Who operates Stevenage Electric Forecourt?

Stevenage Electric Forecourt is on the GRIDSERVE network.

### How long does a Tesla Model Y Long Range take to charge at Stevenage Electric Forecourt (GRIDSERVE)?

A typical 10–80% rapid charge takes about 21 min on the 360 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Stevenage Electric Forecourt (GRIDSERVE)?

A typical 10–80% rapid charge takes about 23 min on the 360 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Stevenage Electric Forecourt (GRIDSERVE)?

A typical 10–80% rapid charge takes about 39 min on the 360 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Stevenage](https://ampmap.co.uk/chargers/united-kingdom/hertfordshire/stevenage)
- [GRIDSERVE chargers](https://ampmap.co.uk/networks/gridserve)

## Chargers near this site

- [eHGV - Stevenage Electric Forecourt · GRIDSERVE Electric Freightway](https://ampmap.co.uk/charger/gridserve-electric-freightway-ehgv-stevenage-electric-forecourt-uk) - CCS 400 kW · Knebworth Park, A1M · From 85p/kWh
- [Stevenage, UK · Tesla](https://ampmap.co.uk/charger/tesla-stevenage-uk-uk) - CCS 250 kW · Knebworth Park · From 29p/kWh
- [Starbucks Stevenage · ChargePoint](https://ampmap.co.uk/charger/chargepoint-starbucks-stevenage-uk) - CCS 150 kW, CHAdeMO 100 kW · Whittle Way
- [Solnet EV GB-SOL001001](https://ampmap.co.uk/charger/solnet-ev-gb-sol001001-uk) - CCS 160 kW · 4 Modular Business Park
- [HU - Monkswood Retail Park · GRIDSERVE](https://ampmap.co.uk/charger/electric-highway-monkswood-retail-park-uk) - CCS 180 kW, CHAdeMO 80 kW · Elder Way · From 85p/kWh
- [Pod Point Tesco Superstore - Stevenage Broadwater](https://ampmap.co.uk/charger/pod-point-tesco-superstore-stevenage-broadwater-uk) - Type 2 7 kW · Broadwater Retail Park · From 44.4p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/gridserve-stevenage-electric-forecourt-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: GRIDSERVE (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.