# EH - Welcome Break Hartshead Moor East · GRIDSERVE

Web page: https://ampmap.co.uk/charger/gridserve-welcome-break-hartshead-moor-east-services-uk

EH - Welcome Break Hartshead Moor East is an EV charging site in Cleckheaton, Kirklees, run by GRIDSERVE and open 24 hours a day. Its 3 sockets reach up to 50 kW, with CHAdeMO at the top speed, and the published price is £0.92 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 711 charging sessions here over the last 30 days.

## Status

3 of 3 open at 23 Nov 2026, 00:14 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** M62 Northbound Jct 25, 26, HD6 4JX
- **Area:** Cleckheaton, Kirklees, United Kingdom
- **Coordinates (latitude, longitude):** 53.71263, -1.74635
- **Parking:** On-street

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CHAdeMO | 50 kW | 1 | £0.92/kWh | 1 free |
| CCS | 45 kW | 1 | £0.92/kWh | 1 free |
| Type 2 | 22 kW | 1 | £0.92/kWh | 1 free |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** GRIDSERVE
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the GRIDSERVE app; RFID card
- **Facilities:** Hotel, Restaurant, Café, Supermarket, Fuel station, Wi-Fi

## Common questions

### How much does it cost to charge at EH - Welcome Break Hartshead Moor East (GRIDSERVE)?

The listed price is £0.92/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at EH - Welcome Break Hartshead Moor East (GRIDSERVE)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

### How many charging sockets does EH - Welcome Break Hartshead Moor East (GRIDSERVE) have?

3 charging sockets: 1 × 45 kW CCS, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2. Live per-socket availability is shown on this page.

### Is EH - Welcome Break Hartshead Moor East (GRIDSERVE) open 24/7?

Yes - EH - Welcome Break Hartshead Moor East (GRIDSERVE) is open 24 hours a day, 7 days a week.

### When is EH - Welcome Break Hartshead Moor East (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is EH - Welcome Break Hartshead Moor East (GRIDSERVE)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 711 observed charging sessions.

### Who operates EH - Welcome Break Hartshead Moor East?

EH - Welcome Break Hartshead Moor East is on the GRIDSERVE network.

### How long does a Tesla Model Y Long Range take to charge at EH - Welcome Break Hartshead Moor East (GRIDSERVE)?

A typical 10–80% rapid charge takes about 78 min on the 45 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - Welcome Break Hartshead Moor East (GRIDSERVE)?

A typical 10–80% rapid charge takes about 56 min on the 45 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at EH - Welcome Break Hartshead Moor East (GRIDSERVE)?

A typical 10–80% rapid charge takes about 73 min on the 45 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Cleckheaton](https://ampmap.co.uk/chargers/united-kingdom/kirklees/cleckheaton)
- [GRIDSERVE chargers](https://ampmap.co.uk/networks/gridserve)

## Chargers near this site

- [Hartshead Moor, UK - Eastbound · Tesla](https://ampmap.co.uk/charger/tesla-hartshead-moor-uk-eastbound-uk) - CCS / Type 2 150 kW, Type 2 150 kW · M62 Junction 25/26 · From 32p/kWh
- [EH - Welcome Break Hartshead Moor West · GRIDSERVE](https://ampmap.co.uk/charger/electric-highway-welcome-break-hartshead-moor-west-services-uk) - CHAdeMO 50 kW, CCS 45 kW · M62 Jct 24, 25 · From 92p/kWh
- [Hartshead Moor, UK - Westbound · Tesla](https://ampmap.co.uk/charger/tesla-hartshead-moor-uk-westbound-uk) - CCS / Type 2 150 kW · 25, M62 · From 29p/kWh
- [Holiday Inn Leeds Brighouse · POGO](https://ampmap.co.uk/charger/pogo-holiday-inn-leeds-brighouse-uk) - CCS 200 kW, Type 2 7 kW · Coal Pit Lane · From 56p/kWh
- [The Lodge at Birkby Hall · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-the-lodge-at-birkby-hall-uk) - Type 2 7 kW · Birkby Lane,
- [Brighouse Sports Centre](https://ampmap.co.uk/charger/brighouse-sports-centre-uk) - Type 2 22 kW · Russell Way

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/gridserve-welcome-break-hartshead-moor-east-services-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: GRIDSERVE (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
