Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

GRIDSERVE · EV charging site

HU - Wolstanton Retail Park

Wolstanton Retail Park, Stoke-on-Trent, ST5 0JX

HU - Wolstanton Retail Park is an EV charging site in Stoke-on-Trent, run by GRIDSERVE and open 24 hours a day. Its 12 sockets reach up to 170 kW, with CCS at the top speed, and the published price is £0.85 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 97% uptime and recorded 1269 charging sessions here over the last 30 days. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Brindley Farm (Stoke-on-Trent) (evyve), 0.3 miles away.

Status

10 of 12 available

Checking status…

VerifiedLive status and details from GRIDSERVE’s data feed. Amp Map updates them automatically.Last synced 20 Nov 2026

Connectors

CCS · 170 kW10 connectors · 85p per kWh9 free1 status unknown
#1100% reliabilityAvailable
#2100% reliabilityAvailable
#3100% reliabilityAvailable
#5100% reliabilityAvailable
#6100% reliabilityAvailable
#7100% reliabilityAvailable
#8100% reliabilityAvailable
#9100% reliabilityAvailable
#10100% reliabilityAvailable
#114% reliabilityStatus unknown
CHAdeMO · 80 kW2 connectors · 85p per kWh1 free1 status unknown
#4100% reliabilityAvailable
#12100% reliabilityStatus unknown

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
GRIDSERVE
Opening hours
Open 24 hours
Parking
Car park
Payment
Bank card at the chargerIn the GRIDSERVE appRFID card

Facilities

RestaurantCaféSupermarketNature

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS170 kW85p per kWh
CHAdeMO80 kW85p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 170 kW CCS~25 min · ≈ 55 kWh · ~£47
Tesla Model 3 Rear-Wheel Drive 10–80% · 170 kW CCS~23 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 170 kW CCS~39 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 170 kW CCS~21 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 170 kW CCS~30 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 170 kW CCS~39 min · ≈ 41 kWh · ~£35
Nissan LEAF 10–80% · 80 kW CHAdeMO~54 min · ≈ 28 kWh · ~£24

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at HU - Wolstanton Retail Park (GRIDSERVE)?

The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at HU - Wolstanton Retail Park (GRIDSERVE)?

Up to 170 kW DC via CCS, CHAdeMO.

How many charging sockets does HU - Wolstanton Retail Park (GRIDSERVE) have?

12 charging sockets: 10 × 170 kW CCS, 2 × 80 kW CHAdeMO. Live per-socket availability is shown on this page.

Is HU - Wolstanton Retail Park (GRIDSERVE) open 24/7?

Yes - HU - Wolstanton Retail Park (GRIDSERVE) is open 24 hours a day, 7 days a week.

When is HU - Wolstanton Retail Park (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is HU - Wolstanton Retail Park (GRIDSERVE)?

Amp Map measured 97% uptime here from recorded live status over the last 30 days, across 1269 observed charging sessions.

Who operates HU - Wolstanton Retail Park?

HU - Wolstanton Retail Park is on the GRIDSERVE network.

Where is the nearest other charger with 50 kW or more to HU - Wolstanton Retail Park (GRIDSERVE)?

Brindley Farm (Stoke-on-Trent) (evyve) is 0.3 miles away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at HU - Wolstanton Retail Park (GRIDSERVE)?

A typical 10–80% rapid charge takes about 25 min on the 170 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HU - Wolstanton Retail Park (GRIDSERVE)?

A typical 10–80% rapid charge takes about 23 min on the 170 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at HU - Wolstanton Retail Park (GRIDSERVE)?

A typical 10–80% rapid charge takes about 39 min on the 170 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 20 Nov 2026

Amp Map does not take payment. You pay the operator.