Grimston Park · EV charging site
Grimston Park
Grimston Grange, Kippax, LS24 9BX
Grimston Park is an EV charging site in Kippax, City and Borough of Leeds, run by Grimston Park and open 24 hours a day. All 4 of its sockets are 22 kW Type 2. Recorded live status shows it is usually busiest around 10 am, and Amp Map measured 100% uptime and recorded 34 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest site with 50 kW or more is High Street Car Park (GeniePoint), 4.3 miles away.
Status
4 of 4 available
Checking status…
Connectors
Type 2 · 22 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Grimston Park
- Opening hours
- Open 24 hours
- Parking
- Car park
- Payment
- In the operator's appRFID card
- Charger ID
- Socket A(1)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Grimston Park?
Up to 22 kW AC via Type 2.
How many charging sockets does Grimston Park have?
4 charging sockets: 4 × 22 kW Type 2. Live per-socket availability is shown on this page.
Is Grimston Park open 24/7?
Yes - Grimston Park is open 24 hours a day, 7 days a week.
When is Grimston Park busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Grimston Park?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 34 observed charging sessions.
Who operates Grimston Park?
Grimston Park is on the Grimston Park network.
Where is the nearest charger with 50 kW or more to Grimston Park?
High Street Car Park (GeniePoint) is 4.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Grimston Park?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Grimston Park?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Grimston Park?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.