Harper Farm · EV charging site
Harper Farm
Pudsey, LS12 6JU
Harper Farm is an EV charging site in Pudsey, City and Borough of Leeds, run by Harper Farm and open 24 hours a day. Both of its sockets are 22 kW Type 2. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 100% uptime and recorded 2 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is McDonald's (InstaVolt Ltd), 1.3 miles away.
Status
2 of 2 available
Checking status…
Connectors
Type 2 · 22 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Harper Farm
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the operator's appRFID card
- Charger ID
- 23370005*A
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Harper Farm?
Up to 22 kW AC via Type 2.
How many charging sockets does Harper Farm have?
2 charging sockets: 2 × 22 kW Type 2. Live per-socket availability is shown on this page.
Is Harper Farm open 24/7?
Yes - Harper Farm is open 24 hours a day, 7 days a week.
When is Harper Farm busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Harper Farm?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 2 observed charging sessions.
Who operates Harper Farm?
Harper Farm is on the Harper Farm network.
Where is the nearest charger with 50 kW or more to Harper Farm?
McDonald's (InstaVolt Ltd) is 1.3 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Harper Farm?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Harper Farm?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Harper Farm?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Evans Halshaw Citroen Leeds
- McDonald's
- MGF Cottingley
- Armley Leisure Centre
- Elland Road Park & Ride
- Gildersome Arms (Morley)
- Cheapest nearby
- Pod Point Evans Halshaw Citroen Leeds · Free · 7 kW · 0.7 mi
- Fastest nearby
- MGF Cottingley · 150 kW · 1.3 mi