Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

EV charging site

Hartland Close

37 Hartland Close, Kingston upon Hull, HU7 4DT

Hartland Close is an EV charging site in Kingston upon Hull, City of Kingston upon Hull. It has a single socket, with CCS at up to 150 kW. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Whistling Goose (Sutton Fields) (evyve), 1 mile away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 18 Aug 2026Last verified 18 Aug 2026

Connectors

CCS · 150 kW6 connectors
Type 2 · 22 kW6 connectors

Site information

Opening hours
Not published
Access
Public

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Hartland Close?

Up to 150 kW DC via Type 2, CCS.

How many charging sockets does Hartland Close have?

1 charging socket: 6 × 22 kW Type 2, 6 × 150 kW CCS.

Where is the nearest other charger with 50 kW or more to Hartland Close?

Whistling Goose (Sutton Fields) (evyve) is 1 mile away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Hartland Close?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hartland Close?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Hartland Close?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 18 Aug 2026

Amp Map does not take payment. You pay the operator.