Heartstone Inns Ltd · EV charging site
Heartstone Inns Ltd
The Charlcombe Inn, Bath, BA1 9BT
Heartstone Inns Ltd is an EV charging site in Bath, Bath and North East Somerset, run by Heartstone Inns Ltd and open 24 hours a day. All 3 of its sockets are 7 kW Type 2. Recorded live status shows it is usually busiest around 11 pm, and Amp Map measured 100% uptime and recorded 38 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Morrisons Bath (GeniePoint), 2.5 miles away.
Status
3 of 3 available
Checking status…
Connectors
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Heartstone Inns Ltd
- Opening hours
- Open 24 hours
- Parking
- Car park
- Payment
- In the operator's appRFID card
- Charger ID
- DKL63359-1
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Heartstone Inns Ltd?
Up to 7 kW AC via Type 2.
How many charging sockets does Heartstone Inns Ltd have?
3 charging sockets: 3 × 7 kW Type 2. Live per-socket availability is shown on this page.
Is Heartstone Inns Ltd open 24/7?
Yes - Heartstone Inns Ltd is open 24 hours a day, 7 days a week.
When is Heartstone Inns Ltd busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 pm and quietest around noon. The live status on this page shows what is free before you set off.
How reliable is Heartstone Inns Ltd?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 38 observed charging sessions.
Who operates Heartstone Inns Ltd?
Heartstone Inns Ltd is on the Heartstone Inns Ltd network.
Where is the nearest charger with 50 kW or more to Heartstone Inns Ltd?
Morrisons Bath (GeniePoint) is 2.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Heartstone Inns Ltd?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Heartstone Inns Ltd?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Heartstone Inns Ltd?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Park and ride
- Pod Point Newbridge Park & Ride
- Pod Point Hope House
- Charlotte Street Car Park
- Revive_BANES
- Morrisons Bath
- Cheapest nearby
- Pod Point Hope House · Free · 7 kW · 2.2 mi
- Fastest nearby
- Morrisons Bath · 50 kW · 2.5 mi