Hubsta · EV charging site
1 Appleby Street
1 Appleby Street, Blackburn, BB1 3BL
1 Appleby Street is an EV charging site in Blackburn, Blackburn with Darwen, run by Hubsta. Both of its sockets are 11 kW Type 2. 12 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Shell Recharge Shell Grimshaw Park, 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Hubsta
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.20p per kWh inc VAT when a member of the Hubsta Network. £0.30p per kWH inc VAT for Pay as you go(from Open Charge Map, 10 Oct 2020)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 1 Appleby Street (Hubsta)?
The listed price is £0.20p per kWh inc VAT when a member of the Hubsta Network. £0.30p per kWH inc VAT for Pay as you go. Prices can change, so check the price at the charger before you start.
How fast is charging at 1 Appleby Street (Hubsta)?
Up to 11 kW AC via Type 2.
How many charging sockets does 1 Appleby Street (Hubsta) have?
2 charging sockets: 2 × 11 kW Type 2.
Who operates 1 Appleby Street?
1 Appleby Street is on the Hubsta network.
Where is the nearest charger with 50 kW or more to 1 Appleby Street (Hubsta)?
Shell Recharge Shell Grimshaw Park is 1 mile away in a straight line, with up to 400 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 1 Appleby Street (Hubsta)?
A 10–80% charge takes about 5h 2m on the 11 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 1 Appleby Street (Hubsta)?
A 10–80% charge takes about 3h 38m on the 11 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 1 Appleby Street (Hubsta)?
A 10–80% charge takes about 4h 39m on the 11 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Tesco Superstore - Blackburn
- Eanam Wharf Business Centre
- Perry's Nissan Blackburn
- Brown Street Car Park
- Carpark Fb Blackburn 1
- Dubai Grill House
- Cheapest nearby
- Pod Point Tesco Superstore - Blackburn · 44.4p per kWh · 7 kW · 0.3 mi
- Fastest nearby
- Eanam Wharf Business Centre · 22 kW · 0.4 mi