Hubsta · EV charging site
Brent Ambulance Station
Falcon Park Industrial Estate, Harlesden, NW10 1RZ
Brent Ambulance Station is an EV charging site in Harlesden, Greater London, run by Hubsta. It has a single 4 kW Type 2 socket, and the price is listed as £0.46/kWh. 164 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 252 Neasden Lane, 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Hubsta
- Opening hours
- Not published
- Access
- Customers only
- Price
- £0.46/kWh(from Open Charge Map, 27 May 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Brent Ambulance Station (Hubsta)?
The listed price is £0.46/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Brent Ambulance Station (Hubsta)?
Up to 4 kW AC via Type 2.
How many charging sockets does Brent Ambulance Station (Hubsta) have?
1 charging socket: 1 × 4 kW Type 2.
Who operates Brent Ambulance Station?
Brent Ambulance Station is on the Hubsta network.
Can anyone charge at Brent Ambulance Station (Hubsta)?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Brent Ambulance Station (Hubsta)?
252 Neasden Lane is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Brent Ambulance Station (Hubsta)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Brent Ambulance Station (Hubsta)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Brent Ambulance Station (Hubsta)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 4 Prout Grove
- ubitricity Distributed Energy Systems UK Ltd. 11 Prout Grove
- ubitricity Distributed Energy Systems UK Ltd. 23 Prout Grove
- ubitricity Distributed Energy Systems UK Ltd. 21 Northview Crescent
- Dog Lane
- ubitricity Distributed Energy Systems UK Ltd. 36 Prout Grove
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 4 Prout Grove · 56p per kWh · 5 kW · 140 yd
- Fastest nearby
- Dog Lane · 22 kW · 0.1 mi