Hubsta · EV charging site
Cobalt Business Exchange
Silverlink Business Park, Wallsend, NE28 9NZ
Cobalt Business Exchange is an EV charging site in Wallsend, North Tyneside, run by Hubsta. Both of its sockets are 7 kW Type 2, and charging is listed as free. 7 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Jolly Bowman (Wallsend) (evyve), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Hubsta
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 27 Nov 2020)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Cobalt Business Exchange (Hubsta)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Cobalt Business Exchange (Hubsta)?
Up to 7 kW AC via Type 2.
How many charging sockets does Cobalt Business Exchange (Hubsta) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Cobalt Business Exchange?
Cobalt Business Exchange is on the Hubsta network.
Where is the nearest charger with 50 kW or more to Cobalt Business Exchange (Hubsta)?
Jolly Bowman (Wallsend) (evyve) is 0.5 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Cobalt Business Exchange (Hubsta)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cobalt Business Exchange (Hubsta)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Cobalt Business Exchange (Hubsta)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Octagon House
- Middle Engine Lane Police Stations
- CBX Management Centre
- Octagon House
- Jolly Bowman (Wallsend)
- IONITY GmbH IONITY Newcastle VH
- Cheapest nearby
- IONITY GmbH IONITY Newcastle VH · 62.3p per kWh · 400 kW · 0.7 mi
- Fastest nearby
- IONITY GmbH IONITY Newcastle VH · 400 kW · 0.7 mi