Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Hubsta · EV charging site

Drive Vauxhall

Trunk Road, Redcar, TS10 5BW

Drive Vauxhall is an EV charging site in Redcar, Redcar and Cleveland, run by Hubsta. Its 4 sockets reach up to 50 kW, with CCS at the top speed. 9 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is McDonald's Redcar Retail Park (InstaVolt Ltd), 0.8 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 9 Oct 2020Last verified 9 Oct 2020

Connectors

CCS · 50 kW1 connector
Type 2 · 7 kW4 connectors

Site information

Operator
Hubsta
Opening hours
Not published
Access
Customers only

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Drive Vauxhall (Hubsta)?

Up to 50 kW DC via Type 2, CCS.

How many charging sockets does Drive Vauxhall (Hubsta) have?

4 charging sockets: 2 × 7 kW Type 2, 2 × 7 kW Type 2, 1 × 50 kW CCS.

Who operates Drive Vauxhall?

Drive Vauxhall is on the Hubsta network.

Can anyone charge at Drive Vauxhall (Hubsta)?

The operator lists this charger for customers of the site.

Where is the nearest other charger with 50 kW or more to Drive Vauxhall (Hubsta)?

McDonald's Redcar Retail Park (InstaVolt Ltd) is 0.8 miles away in a straight line, with up to 120 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Drive Vauxhall (Hubsta)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Drive Vauxhall (Hubsta)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Drive Vauxhall (Hubsta)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 9 Oct 2020