Hubsta · EV charging site
North Street car park, Bridlington, East Yorkshire
North Street, Bridlington, YO15 2DY
North Street car park, Bridlington, East Yorkshire is an EV charging site in Bridlington, East Riding of Yorkshire, run by Hubsta. Both of its sockets are 7 kW Type 2. 7 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Lidl, 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Hubsta
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at North Street car park, Bridlington, East Yorkshire (Hubsta)?
Up to 7 kW AC via Type 2.
How many charging sockets does North Street car park, Bridlington, East Yorkshire (Hubsta) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates North Street car park, Bridlington, East Yorkshire?
North Street car park, Bridlington, East Yorkshire is on the Hubsta network.
Where is the nearest charger with 50 kW or more to North Street car park, Bridlington, East Yorkshire (Hubsta)?
Lidl is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at North Street car park, Bridlington, East Yorkshire (Hubsta)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at North Street car park, Bridlington, East Yorkshire (Hubsta)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at North Street car park, Bridlington, East Yorkshire (Hubsta)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- North Street Car Park
- Pod Point Tesco Superstore - Bridlington
- Lidl
- South Marine Drive
- Beechwood Care Centre
- North Marine Drive
- Cheapest nearby
- Pod Point Tesco Superstore - Bridlington · 44.4p per kWh · 7 kW · 0.2 mi
- Fastest nearby
- Lidl · 50 kW · 0.4 mi