Hubsta · EV charging site
Spencer Street Car Park
Spencer Street, Beverley, HU17 9EG
Spencer Street Car Park is an EV charging site in Beverley, East Riding of Yorkshire, run by Hubsta. It has a single socket, with Type 2 at up to 7 kW. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Pod Point Tesco Superstore - Beverley, 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Hubsta
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.00p per kWh inc VAT when a member of the Hubsta Network. £0.30p per kWh inc VAT for Pay as you go,(from Open Charge Map, 28 Mar 2021)
- Notes
- Double headed 7kw Hubsta post
- Getting there
- Third party schemes & roaming networks. However rates may change so please check with your e-mobility provider for up to date pricing.
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Spencer Street Car Park (Hubsta)?
The listed price is £0.00p per kWh inc VAT when a member of the Hubsta Network. £0.30p per kWh inc VAT for Pay as you go,. Prices can change, so check the price at the charger before you start.
How fast is charging at Spencer Street Car Park (Hubsta)?
Up to 7 kW AC via Type 2.
How many charging sockets does Spencer Street Car Park (Hubsta) have?
1 charging socket: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Spencer Street Car Park?
Spencer Street Car Park is on the Hubsta network.
Where is the nearest charger with 50 kW or more to Spencer Street Car Park (Hubsta)?
Pod Point Tesco Superstore - Beverley is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Spencer Street Car Park (Hubsta)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Spencer Street Car Park (Hubsta)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Spencer Street Car Park (Hubsta)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Pod Point Tesco Superstore - Beverley · 44.4p per kWh · 50 kW · 0.1 mi
- Fastest nearby
- Pod Point Tesco Superstore - Beverley · 50 kW · 0.1 mi