Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Hyperion Number 1 Ltd · EV charging site

Hyperion Number 1 Ltd

One Springfield Drive, Leatherhead Office Park, Surrey, KT22 7NL

Hyperion Number 1 Ltd is an EV charging site in Leatherhead, Surrey, run by Hyperion Number 1 Ltd and open 24 hours a day. All 8 of its sockets are 7 kW Type 2. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 100% uptime and recorded 29 charging sessions here over the last 30 days. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Leatherhead SF Connect (BP Pulse), 0.8 miles away.

Status

8 of 8 available

Checking status…

VerifiedLive status and details from Hyperion Number 1 Ltd’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 7 kW8 connectors8 free
- Socket A(1)100% reliabilityAvailable
- Socket A(1)100% reliabilityAvailable
- Socket A(1)100% reliabilityAvailable
- Socket A(1)100% reliabilityAvailable
- Socket B(2)100% reliabilityAvailable
- Socket B(2)100% reliabilityAvailable
- Socket B(2)100% reliabilityAvailable
- Socket B(2)100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Opening hours
Open 24 hours
Payment
In the operator's appRFID card
Charger ID
- Socket A(1)

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Hyperion Number 1 Ltd?

Up to 7 kW AC via Type 2.

How many charging sockets does Hyperion Number 1 Ltd have?

8 charging sockets: 8 × 7 kW Type 2. Live per-socket availability is shown on this page.

Is Hyperion Number 1 Ltd open 24/7?

Yes - Hyperion Number 1 Ltd is open 24 hours a day, 7 days a week.

When is Hyperion Number 1 Ltd busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 6 pm. The live status on this page shows what is free before you set off.

How reliable is Hyperion Number 1 Ltd?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 29 observed charging sessions.

Who operates Hyperion Number 1 Ltd?

Hyperion Number 1 Ltd is on the Hyperion Number 1 Ltd network.

Where is the nearest charger with 50 kW or more to Hyperion Number 1 Ltd?

Leatherhead SF Connect (BP Pulse) is 0.8 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Hyperion Number 1 Ltd?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hyperion Number 1 Ltd?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Hyperion Number 1 Ltd?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Hyperion Number 1 Ltd · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.