# Hyperion Number 1 Ltd

Web page: https://ampmap.co.uk/charger/hyperion-number-1-ltd-uk

Hyperion Number 1 Ltd is an EV charging site in Leatherhead, Surrey, run by Hyperion Number 1 Ltd and open 24 hours a day. All 8 of its sockets are 7 kW Type 2. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 100% uptime and recorded 29 charging sessions here over the last 30 days.

## Status

8 of 8 open at 22 Nov 2026, 14:14 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** One Springfield Drive, Leatherhead Office Park, Surrey, KT22 7NL
- **Area:** Leatherhead, Surrey, United Kingdom
- **Coordinates (latitude, longitude):** 51.30651, -0.34263

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 7 kW | 8 | Not listed | 8 free |

## Site information

- **Operator:** Hyperion Number 1 Ltd
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Hyperion Number 1 Ltd?

Up to 7 kW AC via Type 2.

### How many charging sockets does Hyperion Number 1 Ltd have?

8 charging sockets: 8 × 7 kW Type 2. Live per-socket availability is shown on this page.

### Is Hyperion Number 1 Ltd open 24/7?

Yes - Hyperion Number 1 Ltd is open 24 hours a day, 7 days a week.

### When is Hyperion Number 1 Ltd busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 6 pm. The live status on this page shows what is free before you set off.

### How reliable is Hyperion Number 1 Ltd?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 29 observed charging sessions.

### Who operates Hyperion Number 1 Ltd?

Hyperion Number 1 Ltd is on the Hyperion Number 1 Ltd network.

### How long does a Tesla Model Y Long Range take to charge at Hyperion Number 1 Ltd?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hyperion Number 1 Ltd?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Hyperion Number 1 Ltd?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Leatherhead](https://ampmap.co.uk/chargers/united-kingdom/surrey/leatherhead)

## Chargers near this site

- [VW · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-vw-uk) - Type 2 7 kW · VW, Milton House, Springfield drive, Leather
- [Pod Point Tesco Superstore - Leatherhead](https://ampmap.co.uk/charger/pod-point-tesco-superstore-leatherhead-uk) - Type 2 7 kW · Oxshott Road · From 44.4p/kWh
- [Copthorne Road · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-copthorne-road-uk) - Type 2 22 kW · Copthorne Road
- [Randalls Road Car Park · EB Charging](https://ampmap.co.uk/charger/eb-charging-randalls-road-car-park-uk) - Type 2 22 kW · Bull Hill
- [Leatherhead SF Connect · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-leatherhead-sf-connect-uk) - CCS 150 kW · Kingston Road
- [Great Shott Car Park · EB Charging](https://ampmap.co.uk/charger/eb-charging-great-shott-car-park-uk) - Type 2 22 kW · Station Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/hyperion-number-1-ltd-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Hyperion Number 1 Ltd (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
