EV charging site
ICUEVE900237
7 Winster Place, Poulton-le-Fylde, FY4 4SJ
ICUEVE900237 is an EV charging site at 7 Winster Place in Poulton-le-Fylde, Lancashire. It has a single 7 kW Type 2 socket. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Plum Tree Farm (Blackpool) (evyve), 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at ICUEVE900237?
Up to 7 kW AC via Type 2.
How many charging sockets does ICUEVE900237 have?
1 charging socket: 1 × 7 kW Type 2.
Where is the nearest charger with 50 kW or more to ICUEVE900237?
Plum Tree Farm (Blackpool) (evyve) is 0.8 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at ICUEVE900237?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at ICUEVE900237?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at ICUEVE900237?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Plum Tree Farm (Blackpool)
- IONITY GmbH IONITY Blackpool VH
- Intelligent Charging Systems
- Blackpool Victoria Hospital
- The Grange, Blackpool
- Chorley Nissan Blackpool
- Cheapest nearby
- IONITY GmbH IONITY Blackpool VH · 62.3p per kWh · 400 kW · 1.2 mi
- Fastest nearby
- IONITY GmbH IONITY Blackpool VH · 400 kW · 1.2 mi