Incharge (SE) · EV charging site
Wish Road
Wish Road, Hove, BN3 4LN
Wish Road is an EV charging site in Hove, Brighton and Hove, run by Incharge (SE). It has a single 22 kW Type 2 socket, and the price is listed as £0.30/kWh. 74 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Hove SF Connect (BP Pulse), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Incharge (SE)
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.30/kWh(from Open Charge Map, 24 May 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Wish Road (Incharge (SE))?
The listed price is £0.30/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Wish Road (Incharge (SE))?
Up to 22 kW AC via Type 2.
How many charging sockets does Wish Road (Incharge (SE)) have?
1 charging socket: 1 × 22 kW Type 2.
Who operates Wish Road?
Wish Road is on the Incharge (SE) network.
Where is the nearest charger with 50 kW or more to Wish Road (Incharge (SE))?
Hove SF Connect (BP Pulse) is 0.5 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Wish Road (Incharge (SE))?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wish Road (Incharge (SE))?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Wish Road (Incharge (SE))?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.