# Aikenhead Filling Station · InstaVolt Ltd

Web page: https://ampmap.co.uk/charger/instavolt-ltd-aikenhead-filling-station-uk

Aikenhead Filling Station is an EV charging site in Rutherglen, South Lanarkshire, run by InstaVolt Ltd. Both of its sockets are 50 kW CHAdeMO and CCS, and the price is listed as £0.75/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Aikenhead Road, G42 0PN
- **Area:** Rutherglen, South Lanarkshire, United Kingdom
- **Coordinates (latitude, longitude):** 55.83234, -4.24796

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 2 | Not listed |
| CHAdeMO | 50 kW | 2 | Not listed |

- **Price:** £0.75/kWh (from Open Charge Map)

## Site information

- **Operator:** InstaVolt Ltd
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at Aikenhead Filling Station (InstaVolt Ltd)?

The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Aikenhead Filling Station (InstaVolt Ltd)?

Up to 50 kW DC via CHAdeMO, CCS.

### How many charging sockets does Aikenhead Filling Station (InstaVolt Ltd) have?

2 charging sockets: 2 × 50 kW CHAdeMO, 2 × 50 kW CCS.

### Who operates Aikenhead Filling Station?

Aikenhead Filling Station is on the InstaVolt Ltd network.

### How long does a Tesla Model Y Long Range take to charge at Aikenhead Filling Station (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Aikenhead Filling Station (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Aikenhead Filling Station (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Rutherglen](https://ampmap.co.uk/chargers/united-kingdom/south-lanarkshire/rutherglen)
- [InstaVolt Ltd chargers](https://ampmap.co.uk/networks/instavolt-ltd)

## Chargers near this site

- [Holyrood Sports Complex · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-holyrood-sports-complex-uk) - Type 2 7 kW · 60 Aikenhead Road
- [Holyrood Leisure Centre · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-holyrood-leisure-centre-uk) - Type 2 22 kW · Albert Road
- [Hampden Park and Ride · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-hampden-park-and-ride-uk) - CCS 50 kW, CHAdeMO 50 kW · Aikenhead Road
- [IONITY GmbH IONITY Polmadie](https://ampmap.co.uk/charger/ionity-polmadie-uk) - CCS 350 kW · Polmadie Road 109 · From 83.3p/kWh
- [Letherby Drive · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-letherby-drive-uk) - CCS 22 kW, CHAdeMO 22 kW · Letherby Drive
- [Allison Street · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-allison-street-uk) - Type 2 7 kW · Allison Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/instavolt-ltd-aikenhead-filling-station-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 3 Mar 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
