# Bannatyne Health Club Stepps · InstaVolt Ltd

Web page: https://ampmap.co.uk/charger/instavolt-ltd-bannatyne-health-club-stepps-uk

Bannatyne Health Club Stepps is an EV charging site in Bishopbriggs, East Dunbartonshire, run by InstaVolt Ltd. Both of its sockets are 50 kW CCS, and the price is listed as £0.75/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Buchanan Business Park, G33 6HZ
- **Area:** Bishopbriggs, East Dunbartonshire, United Kingdom
- **Coordinates (latitude, longitude):** 55.89274, -4.13981

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 4 | Not listed |

- **Price:** £0.75/kWh (from Open Charge Map)

## Site information

- **Operator:** InstaVolt Ltd
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)
- **Notes:** May be on free (introductory) vend.

## Common questions

### How much does it cost to charge at Bannatyne Health Club Stepps (InstaVolt Ltd)?

The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Bannatyne Health Club Stepps (InstaVolt Ltd)?

Up to 50 kW DC via CCS.

### How many charging sockets does Bannatyne Health Club Stepps (InstaVolt Ltd) have?

2 charging sockets: 2 × 50 kW CCS, 2 × 50 kW CCS.

### Who operates Bannatyne Health Club Stepps?

Bannatyne Health Club Stepps is on the InstaVolt Ltd network.

### How long does a Tesla Model Y Long Range take to charge at Bannatyne Health Club Stepps (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bannatyne Health Club Stepps (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Bannatyne Health Club Stepps (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Bishopbriggs](https://ampmap.co.uk/chargers/united-kingdom/east-dunbartonshire/bishopbriggs)
- [InstaVolt Ltd chargers](https://ampmap.co.uk/networks/instavolt-ltd)

## Chargers near this site

- [Blenheim Avenue Car Park · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-blenheim-avenue-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Blenheim Avenue
- [Robroyston Station Park & Ride · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-robroyston-station-park-and-ride-uk) - CCS 50 kW, CHAdeMO 50 kW · Robroyston Station Park & Ride
- [For EV Redcastle Square Garthamlock](https://ampmap.co.uk/charger/forev-for-ev-redcastle-square-garthamlock-uk) - ForEV · CCS 160 kW, CHAdeMO 50 kW · Redcastle Square
- [Redcastle Square - 0202 · FOR EV](https://ampmap.co.uk/charger/for-ev-redcastle-square-0202-uk) - CCS 160 kW, CCS 50 kW · Redcastle Square · From 68p/kWh
- [Pod Point Glasgow Fort (Hercules Unit Trust)](https://ampmap.co.uk/charger/pod-point-glasgow-fort-shopping-centre-uk) - Type 2 3 kW · Junction 10 M8 · From 49.2p/kWh
- [Morrisons · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-16-uk) - CHAdeMO 50 kW, Type 2 50 kW · Auchinlea Way

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/instavolt-ltd-bannatyne-health-club-stepps-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 3 Mar 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
