# Bourne Retail Park · InstaVolt Ltd

Web page: https://ampmap.co.uk/charger/instavolt-ltd-bourne-retail-park-uk

Bourne Retail Park is a planned EV charging site in Salisbury, Wiltshire, run by InstaVolt Ltd. Its 2 sockets reach up to 120 kW, with CHAdeMO at the top speed, and the price is listed as £0.75/kWh.

## Status

Listed as coming soon. Check before you travel.

## Location

- **Address:** Southampton Road, SP1 2LB
- **Area:** Salisbury, Wiltshire, United Kingdom
- **Coordinates (latitude, longitude):** 51.06246, -1.77848

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CHAdeMO | 120 kW | 2 | Not listed |
| CCS | 100 kW | 2 | Not listed |

- **Price:** £0.75/kWh (from Open Charge Map)

## Site information

- **Operator:** InstaVolt Ltd
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at Bourne Retail Park (InstaVolt Ltd)?

The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Bourne Retail Park (InstaVolt Ltd)?

Up to 120 kW DC via CHAdeMO, CCS.

### How many charging sockets does Bourne Retail Park (InstaVolt Ltd) have?

2 charging sockets: 2 × 120 kW CHAdeMO, 2 × 100 kW CCS.

### Who operates Bourne Retail Park?

Bourne Retail Park is on the InstaVolt Ltd network.

### How long does a Tesla Model Y Long Range take to charge at Bourne Retail Park (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 36 min on the 100 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bourne Retail Park (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 29 min on the 100 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Bourne Retail Park (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 43 min on the 100 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Salisbury](https://ampmap.co.uk/chargers/united-kingdom/wiltshire/salisbury)
- [Cheapest charging in Salisbury](https://ampmap.co.uk/chargers/united-kingdom/wiltshire/salisbury/cheapest)
- [InstaVolt Ltd chargers](https://ampmap.co.uk/networks/instavolt-ltd)

## Chargers near this site

- [Pod Point Tesco Extra - Salisbury](https://ampmap.co.uk/charger/pod-point-tesco-extra-salisbury-uk) - Type 2 7 kW · Bourne Centre Southampton Road · From 44.4p/kWh
- [Petersfinger (Park and Ride) · MER](https://ampmap.co.uk/charger/mer-petersfinger-park-and-ride-uk) - Type 2 7 kW · A36 Southampton Road
- [Brown Street (West) Car Park · MER](https://ampmap.co.uk/charger/mer-brown-street-west-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Brown Street
- [Salisbury SF Connect · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-salisbury-sf-connect-uk) - CCS 150 kW · Downton Road
- [The Red Lion Hotel · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-the-red-lion-hotel-uk) - Type 2 7 kW · Brown Street
- [Britford Park & Ride, Salisbury · MER](https://ampmap.co.uk/charger/mer-britford-park-and-ride-salisbury-uk) - Type 2 7 kW · Downton Road (A338)

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/instavolt-ltd-bourne-retail-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 3 Mar 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
