# Bridport Leisure Centre · InstaVolt Ltd

Web page: https://ampmap.co.uk/charger/instavolt-ltd-bridport-leisure-centre-uk

Bridport Leisure Centre is an EV charging site in Bridport, Dorset, run by InstaVolt Ltd. Its 2 sockets reach up to 120 kW, with CCS at the top speed, and the price is listed as £0.85/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Bridport Leisure Centre, DT6 5NJ
- **Area:** Bridport, Dorset, United Kingdom
- **Coordinates (latitude, longitude):** 50.72624, -2.76316

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 120 kW | 2 | Not listed |
| CHAdeMO | 50 kW | 2 | Not listed |

- **Price:** £0.85/kWh (from Open Charge Map)

## Site information

- **Operator:** InstaVolt Ltd
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at Bridport Leisure Centre (InstaVolt Ltd)?

The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Bridport Leisure Centre (InstaVolt Ltd)?

Up to 120 kW DC via CCS, CHAdeMO.

### How many charging sockets does Bridport Leisure Centre (InstaVolt Ltd) have?

2 charging sockets: 2 × 120 kW CCS, 2 × 50 kW CHAdeMO.

### Who operates Bridport Leisure Centre?

Bridport Leisure Centre is on the InstaVolt Ltd network.

### How long does a Tesla Model Y Long Range take to charge at Bridport Leisure Centre (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bridport Leisure Centre (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Bridport Leisure Centre (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Bridport](https://ampmap.co.uk/chargers/united-kingdom/dorset/bridport)
- [InstaVolt Ltd chargers](https://ampmap.co.uk/networks/instavolt-ltd)

## Chargers near this site

- [South Street Car Park · Be.EV](https://ampmap.co.uk/charger/joju-ltd-south-street-car-park-2-uk) - Type 2 22 kW · DRC South Street Car Park · From 59p/kWh
- [Plotinghams Car Park · Be.EV](https://ampmap.co.uk/charger/be-ev-plotinghams-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Plotinghams Car Park · From 59p/kWh
- [DRC East Street Car Park · Be.EV](https://ampmap.co.uk/charger/mer-bridport-east-street-car-park-uk) - CCS 75 kW, CHAdeMO 50 kW · East Street Car Park · From 84p/kWh
- [Bridge House Hotel](https://ampmap.co.uk/charger/bridge-house-hotel-uk) - Unknown 7 kW · 115 East Street
- [West Bay Road Car Park · Be.EV](https://ampmap.co.uk/charger/joju-ltd-drc-west-bay-road-car-park-1-uk) - CCS 300 kW, CCS 50 kW · West Bay Road Car Park · From 59p/kWh
- [Chris Stubbs and Son Electrical Ltd](https://ampmap.co.uk/charger/chris-stubbs-and-son-electrical-ltd-uk) - Type 2 7 kW · Shoe Lane

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/instavolt-ltd-bridport-leisure-centre-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 30 Mar 2024).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
