# Co-op Necton Tuns Lane · InstaVolt Ltd

Web page: https://ampmap.co.uk/charger/instavolt-ltd-co-op-necton-tuns-lane-uk

Co-op Necton Tuns Lane is an EV charging site in East Dereham, Norfolk, run by InstaVolt Ltd. Its 8 sockets reach up to 125 kW, with CCS at the top speed, and the price is listed as £0.75/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** A47, PE37 8DQ
- **Area:** East Dereham, Norfolk, United Kingdom
- **Coordinates (latitude, longitude):** 52.65579, 0.77351
- **Getting there:** Use main entry for petrol station navigate to the right behind supermarket then turn left into 8-space parking aisle

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 125 kW | 8 | Not listed |
| CHAdeMO | 63 kW | 8 | Not listed |

- **Price:** £0.75/kWh (from Open Charge Map)

## Site information

- **Operator:** InstaVolt Ltd
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at Co-op Necton Tuns Lane (InstaVolt Ltd)?

The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Co-op Necton Tuns Lane (InstaVolt Ltd)?

Up to 125 kW DC via CHAdeMO, CCS.

### How many charging sockets does Co-op Necton Tuns Lane (InstaVolt Ltd) have?

8 charging sockets: 8 × 63 kW CHAdeMO, 8 × 125 kW CCS.

### Who operates Co-op Necton Tuns Lane?

Co-op Necton Tuns Lane is on the InstaVolt Ltd network.

### How long does a Tesla Model Y Long Range take to charge at Co-op Necton Tuns Lane (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 30 min on the 125 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Co-op Necton Tuns Lane (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 25 min on the 125 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Co-op Necton Tuns Lane (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 40 min on the 125 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in East Dereham](https://ampmap.co.uk/chargers/united-kingdom/norfolk/east-dereham)
- [Cheapest charging in East Dereham](https://ampmap.co.uk/chargers/united-kingdom/norfolk/east-dereham/cheapest)
- [InstaVolt Ltd chargers](https://ampmap.co.uk/networks/instavolt-ltd)

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/instavolt-ltd-co-op-necton-tuns-lane-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 3 Mar 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
