# DoubleTree Hilton · InstaVolt Ltd

Web page: https://ampmap.co.uk/charger/instavolt-ltd-doubletree-hilton-uk

DoubleTree Hilton is an EV charging site in Nailsea, North Somerset, run by InstaVolt Ltd. Its 2 sockets reach up to 120 kW, with CCS at the top speed, and the price is listed as £0.75/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Frost Hill, Congresbury, BS49 5AD
- **Area:** Nailsea, North Somerset, United Kingdom
- **Coordinates (latitude, longitude):** 51.38184, -2.80623

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 120 kW | 2 | Not listed |
| CHAdeMO | 50 kW | 2 | Not listed |

- **Price:** £0.75/kWh (from Open Charge Map)

## Site information

- **Operator:** InstaVolt Ltd
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at DoubleTree Hilton (InstaVolt Ltd)?

The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at DoubleTree Hilton (InstaVolt Ltd)?

Up to 120 kW DC via CCS, CHAdeMO.

### How many charging sockets does DoubleTree Hilton (InstaVolt Ltd) have?

2 charging sockets: 2 × 120 kW CCS, 2 × 50 kW CHAdeMO.

### Who operates DoubleTree Hilton?

DoubleTree Hilton is on the InstaVolt Ltd network.

### How long does a Tesla Model Y Long Range take to charge at DoubleTree Hilton (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at DoubleTree Hilton (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at DoubleTree Hilton (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Nailsea](https://ampmap.co.uk/chargers/united-kingdom/north-somerset/nailsea)
- [InstaVolt Ltd chargers](https://ampmap.co.uk/networks/instavolt-ltd)

## Chargers near this site

- [Star (Congresbury) · evyve](https://ampmap.co.uk/charger/evyve-star-congresbury-uk) - CCS 75 kW · Rhodyate Hill · From 85p/kWh
- [EVC Mendip Spring Golf Club · Roam Charging](https://ampmap.co.uk/charger/roam-charging-evc-mendip-spring-golf-club-uk) - Type 2 22 kW · Mendip Spring Golf Club
- [Solarsense · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-solarsense-uk) - Type 2 7 kW · Helios House, Brockley Lane
- [Lye Cross Farm · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-lye-cross-farm-uk) - CCS 120 kW, CHAdeMO 50 kW · Lye Cross Farm
- [Pod Point Tesco Superstore - Clevedon](https://ampmap.co.uk/charger/pod-point-tesco-superstore-clevedon-uk) - Type 2 7 kW · Kenn Road · From 44.4p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/instavolt-ltd-doubletree-hilton-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 5 Mar 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
