# Enterprise Way · InstaVolt Ltd

Web page: https://ampmap.co.uk/charger/instavolt-ltd-enterprise-way-uk

Enterprise Way is an EV charging site in Mansfield Woodhouse, Nottinghamshire, run by InstaVolt Ltd. Both of its sockets are 100 kW CCS and CHAdeMO, and the price is listed as £0.75/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Enterprise Way, S44 5FD
- **Area:** Mansfield Woodhouse, Nottinghamshire, United Kingdom
- **Coordinates (latitude, longitude):** 53.22503, -1.22234

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 100 kW | 2 | Not listed |
| CHAdeMO | 100 kW | 2 | Not listed |

- **Price:** £0.75/kWh (from Open Charge Map)

## Site information

- **Operator:** InstaVolt Ltd
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at Enterprise Way (InstaVolt Ltd)?

The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Enterprise Way (InstaVolt Ltd)?

Up to 100 kW DC via CCS, CHAdeMO.

### How many charging sockets does Enterprise Way (InstaVolt Ltd) have?

2 charging sockets: 2 × 100 kW CCS, 2 × 100 kW CHAdeMO.

### Who operates Enterprise Way?

Enterprise Way is on the InstaVolt Ltd network.

### How long does a Tesla Model Y Long Range take to charge at Enterprise Way (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 36 min on the 100 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Enterprise Way (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 29 min on the 100 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Enterprise Way (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 43 min on the 100 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Mansfield Woodhouse](https://ampmap.co.uk/chargers/united-kingdom/nottinghamshire/mansfield-woodhouse)
- [InstaVolt Ltd chargers](https://ampmap.co.uk/networks/instavolt-ltd)

## Chargers near this site

- [Fraser Group Plc](https://ampmap.co.uk/charger/fraser-group-plc-2-uk) - Type 2 7 kW · 3, Maiden Road
- [Fraser Group Plc](https://ampmap.co.uk/charger/fraser-group-plc-uk) - Type 2 7 kW · 3
- [Morrisons Bolsover · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-bolsover-uk) - CCS 50 kW, CHAdeMO 50 kW · Oxcroft Lane
- [Middle Street Car Park · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-middle-street-car-park-bolsover-uk) - Type 2 7 kW · Middle Street Car Park, Bolsover · From 65p/kWh
- [S&L Office · VIRTA](https://ampmap.co.uk/charger/virta-s-and-l-office-uk) - Type 2 22 kW · Leeming Lane North Leeming Lane North
- [CCUK EV Limited](https://ampmap.co.uk/charger/ccuk-ev-limited-uk) - Type 2 7 kW · NG19 8LJ

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/instavolt-ltd-enterprise-way-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 3 Mar 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
