InstaVolt Ltd · EV charging site
Exe Valley Leisure Centre
Bolham Road, Tiverton, EX16 6SG
Exe Valley Leisure Centre is an EV charging site in Tiverton, Devon, run by InstaVolt Ltd. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as £0.75/kWh. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Shell Recharge Shell Tiverton, 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- InstaVolt Ltd
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.75/kWh(from Open Charge Map, 3 Mar 2023)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Exe Valley Leisure Centre (InstaVolt Ltd)?
The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Exe Valley Leisure Centre (InstaVolt Ltd)?
Up to 50 kW DC via CHAdeMO, CCS.
How many charging sockets does Exe Valley Leisure Centre (InstaVolt Ltd) have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Exe Valley Leisure Centre?
Exe Valley Leisure Centre is on the InstaVolt Ltd network.
Where is the nearest other charger with 50 kW or more to Exe Valley Leisure Centre (InstaVolt Ltd)?
Shell Recharge Shell Tiverton is 0.8 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Exe Valley Leisure Centre (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Exe Valley Leisure Centre (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Exe Valley Leisure Centre (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Tesco Superstore - Tiverton
- Best Western Tiverton Hotel
- Shell Recharge Shell Tiverton
- McDonald's Tiverton
- EVC Hartnoll Hotel
- Home
- Cheapest nearby
- Pod Point Tesco Superstore - Tiverton · 44.4p per kWh · 7 kW · 0.5 mi
- Fastest nearby
- Shell Recharge Shell Tiverton · 150 kW · 0.8 mi