# Grandstand Services · InstaVolt Ltd

Web page: https://ampmap.co.uk/charger/instavolt-ltd-grandstand-services-uk

Grandstand Services is an EV charging site in Bedlington, Northumberland, run by InstaVolt Ltd. Both of its sockets are 50 kW CHAdeMO and CCS, and the price is listed as £0.75/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Fairmoor, NE61 3JN
- **Area:** Bedlington, Northumberland, United Kingdom
- **Coordinates (latitude, longitude):** 55.18055, -1.71375

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 2 | Not listed |
| CHAdeMO | 50 kW | 2 | Not listed |

- **Price:** £0.75/kWh (from Open Charge Map)

## Site information

- **Operator:** InstaVolt Ltd
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at Grandstand Services (InstaVolt Ltd)?

The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Grandstand Services (InstaVolt Ltd)?

Up to 50 kW DC via CHAdeMO, CCS.

### How many charging sockets does Grandstand Services (InstaVolt Ltd) have?

2 charging sockets: 2 × 50 kW CHAdeMO, 2 × 50 kW CCS.

### Who operates Grandstand Services?

Grandstand Services is on the InstaVolt Ltd network.

### How long does a Tesla Model Y Long Range take to charge at Grandstand Services (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Grandstand Services (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Grandstand Services (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Bedlington](https://ampmap.co.uk/chargers/united-kingdom/northumberland/bedlington)
- [InstaVolt Ltd chargers](https://ampmap.co.uk/networks/instavolt-ltd)

## Chargers near this site

- [St James Carpark · evcharge.online](https://ampmap.co.uk/charger/evcharge-online-st-james-carpark-uk) - Type 2 7 kW · Well Way
- [St James · EO Charging](https://ampmap.co.uk/charger/eo-charging-st-james-uk) - Type 2 22 kW · Wellway
- [Morpeth NHS Centre](https://ampmap.co.uk/charger/morpeth-nhs-centre-uk) - The Mount
- [Newmarket Car Park · EO Charging](https://ampmap.co.uk/charger/eo-charging-newmarket-car-park-uk) - Type 2 22 kW · Newmarket East
- [Morrisons Morpeth · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-morpeth-uk) - CHAdeMO 50 kW, Type 2 50 kW · Wm Morrison Supermarkets PLC
- [Stanley Terrace · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-stanley-terrace-uk) - CCS 50 kW, CHAdeMO 50 kW · Stanley Terrace

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/instavolt-ltd-grandstand-services-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 3 Mar 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
