InstaVolt Ltd · EV charging site
Greenlaw Village
Greenlaw Place, Newton Mearns, G77 6GR
Greenlaw Village is an EV charging site in Newton Mearns, East Renfrewshire, run by InstaVolt Ltd. Both of its sockets are 50 kW CCS and CHAdeMO, and the price is listed as £0.75/kWh. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Old Plane Tree, Glasgow (Osprey Charging), 1.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- InstaVolt Ltd
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.75/kWh(from Open Charge Map, 3 Mar 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Greenlaw Village (InstaVolt Ltd)?
The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Greenlaw Village (InstaVolt Ltd)?
Up to 50 kW DC via CCS, CHAdeMO.
How many charging sockets does Greenlaw Village (InstaVolt Ltd) have?
2 charging sockets: 2 × 50 kW CCS, 2 × 50 kW CHAdeMO.
Who operates Greenlaw Village?
Greenlaw Village is on the InstaVolt Ltd network.
Where is the nearest other charger with 50 kW or more to Greenlaw Village (InstaVolt Ltd)?
Old Plane Tree, Glasgow (Osprey Charging) is 1.3 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Greenlaw Village (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Greenlaw Village (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Greenlaw Village (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Stewarton Road
- The Avenue Shopping Centre, Glasgow
- The Avenue Shopping Centre
- Old Plane Tree, Glasgow
- Broomburn Shops Car Park, Renfrewshire
- Pod Point David Lloyd - Glasgow Rouken Glen
- Cheapest nearby
- Pod Point David Lloyd - Glasgow Rouken Glen · Free · 7 kW · 1.5 mi
- Fastest nearby
- Old Plane Tree, Glasgow · 60 kW · 1.3 mi