# Harvest Energy Service Station · InstaVolt Ltd

Web page: https://ampmap.co.uk/charger/instavolt-ltd-harvest-energy-service-station-uk

Harvest Energy Service Station is an EV charging site in Harlow, Essex, run by InstaVolt Ltd. Both of its sockets are 50 kW CCS and CHAdeMO, and the price is listed as £0.75/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 215 High Road, CM16 6ED
- **Area:** Harlow, Essex, United Kingdom
- **Coordinates (latitude, longitude):** 51.72091, 0.17811

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 2 | Not listed |
| CHAdeMO | 50 kW | 2 | Not listed |

- **Price:** £0.75/kWh (from Open Charge Map)

## Site information

- **Operator:** InstaVolt Ltd
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at Harvest Energy Service Station (InstaVolt Ltd)?

The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Harvest Energy Service Station (InstaVolt Ltd)?

Up to 50 kW DC via CCS, CHAdeMO.

### How many charging sockets does Harvest Energy Service Station (InstaVolt Ltd) have?

2 charging sockets: 2 × 50 kW CCS, 2 × 50 kW CHAdeMO.

### Who operates Harvest Energy Service Station?

Harvest Energy Service Station is on the InstaVolt Ltd network.

### How long does a Tesla Model Y Long Range take to charge at Harvest Energy Service Station (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Harvest Energy Service Station (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Harvest Energy Service Station (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Harlow](https://ampmap.co.uk/chargers/united-kingdom/essex/harlow)
- [InstaVolt Ltd chargers](https://ampmap.co.uk/networks/instavolt-ltd)

## Chargers near this site

- [Blue Diamond Harlow · Be.EV](https://ampmap.co.uk/charger/be-ev-blue-diamond-harlow-uk) - CCS 150 kW, CHAdeMO 50 kW · Canes Lane · From 84p/kWh
- [IONITY GmbH IONITY Harlow](https://ampmap.co.uk/charger/ionity-gmbh-ionity-harlow-uk) - CCS 400 kW, CCS 350 kW · London Road · From 83.3p/kWh
- [Harlow Gate SF Connect · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-harlow-gate-sf-connect-uk) - CCS 300 kW, CHAdeMO 100 kW · Potter Street
- [InstaVolt Chipping Ongar · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-instavolt-chipping-ongar-uk) - CCS 120 kW, CHAdeMO 50 kW · Bansons Lane
- [Pod Point Cottis Yard](https://ampmap.co.uk/charger/pod-point-cottis-lane-car-park-uk) - Type 2 22 kW, Type 2 7 kW · 199 Cottis Lane · Free to use
- [Pod Point Tesco Superstore - Epping](https://ampmap.co.uk/charger/pod-point-tesco-superstore-epping-2-uk) - Type 2 7 kW · 77-79 High Street · From 44.4p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/instavolt-ltd-harvest-energy-service-station-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 3 Apr 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
