InstaVolt Ltd · EV charging site
Hopwood Service Station
800 Rochdale Road, Middleton, M24 2RB
Hopwood Service Station is an EV charging site in Middleton, Borough of Rochdale, run by InstaVolt Ltd. Both of its sockets are 50 kW CCS and CHAdeMO, and the price is listed as £0.75/kWh. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Sandbrook Park, Rochdale (Osprey Charging), 1.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- InstaVolt Ltd
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.75/kWh(from Open Charge Map, 3 Mar 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Hopwood Service Station (InstaVolt Ltd)?
The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Hopwood Service Station (InstaVolt Ltd)?
Up to 50 kW DC via CCS, CHAdeMO.
How many charging sockets does Hopwood Service Station (InstaVolt Ltd) have?
2 charging sockets: 2 × 50 kW CCS, 2 × 50 kW CHAdeMO.
Who operates Hopwood Service Station?
Hopwood Service Station is on the InstaVolt Ltd network.
Where is the nearest other charger with 50 kW or more to Hopwood Service Station (InstaVolt Ltd)?
Sandbrook Park, Rochdale (Osprey Charging) is 1.9 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Hopwood Service Station (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hopwood Service Station (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Hopwood Service Station (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Williams Group Roch Rear AC
- Middleton Arena Car Park
- Pod Point Tesco Superstore - Rochdale
- Sandbrook Park, Rochdale
- Pod Point Elk Mill Shopping Park (Elk Mill Oldham Limited)
- Pod Point Tesco Extra - Middleton
- Cheapest nearby
- Pod Point Tesco Superstore - Rochdale · 44.4p per kWh · 7 kW · 1.9 mi
- Fastest nearby
- Sandbrook Park, Rochdale · 300 kW · 1.9 mi