InstaVolt Ltd · EV charging site
Instavolt Bishop Auckland
A688, Bishop Auckland, DL14 9AE
Instavolt Bishop Auckland is a planned EV charging site in Bishop Auckland, County Durham, run by InstaVolt Ltd. Its 2 sockets reach up to 120 kW, with CCS at the top speed, and the price is listed as £0.75/kWh. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Auckland Retail Park (Be.EV), 160 yards away.
Status
Coming soon
Listed as coming soon. Check before you travel.
Connectors
Site information
- Operator
- InstaVolt Ltd
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.75/kWh(from Open Charge Map, 6 Jun 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Instavolt Bishop Auckland (InstaVolt Ltd)?
The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Instavolt Bishop Auckland (InstaVolt Ltd)?
Up to 120 kW DC via CCS, CHAdeMO.
How many charging sockets does Instavolt Bishop Auckland (InstaVolt Ltd) have?
2 charging sockets: 2 × 120 kW CCS, 2 × 50 kW CHAdeMO.
Who operates Instavolt Bishop Auckland?
Instavolt Bishop Auckland is on the InstaVolt Ltd network.
Where is the nearest other charger with 50 kW or more to Instavolt Bishop Auckland (InstaVolt Ltd)?
Auckland Retail Park (Be.EV) is 160 yards away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Instavolt Bishop Auckland (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Instavolt Bishop Auckland (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Instavolt Bishop Auckland (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Auckland Retail Park
- Sainsbury's Bishop Auckland
- Pod Point Tesco Extra - Bishop Auckland
- Bishop Auckland College
- DCC Hardwick Park 1
- Morrisons Bishop Auckland
- Cheapest nearby
- Pod Point Tesco Extra - Bishop Auckland · 44.4p per kWh · 7 kW · 0.3 mi
- Fastest nearby
- Auckland Retail Park · 150 kW · 160 yd