# InstaVolt Route 303 · InstaVolt Ltd

Web page: https://ampmap.co.uk/charger/instavolt-ltd-instavolt-route-303-uk

InstaVolt Route 303 is an EV charging site in Taunton, Somerset, run by InstaVolt Ltd. Both of its sockets are 125 kW CHAdeMO and CCS, and the price is listed as £0.75/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** A303, EX14 9ND
- **Area:** Taunton, Somerset, United Kingdom
- **Coordinates (latitude, longitude):** 50.87447, -3.09326

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 125 kW | 2 | Not listed |
| CHAdeMO | 125 kW | 2 | Not listed |

- **Price:** £0.75/kWh (from Open Charge Map)

## Site information

- **Operator:** InstaVolt Ltd
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at InstaVolt Route 303 (InstaVolt Ltd)?

The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at InstaVolt Route 303 (InstaVolt Ltd)?

Up to 125 kW DC via CHAdeMO, CCS.

### How many charging sockets does InstaVolt Route 303 (InstaVolt Ltd) have?

2 charging sockets: 2 × 125 kW CHAdeMO, 2 × 125 kW CCS.

### Who operates InstaVolt Route 303?

InstaVolt Route 303 is on the InstaVolt Ltd network.

### How long does a Tesla Model Y Long Range take to charge at InstaVolt Route 303 (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 30 min on the 125 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at InstaVolt Route 303 (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 25 min on the 125 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at InstaVolt Route 303 (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 40 min on the 125 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Taunton](https://ampmap.co.uk/chargers/united-kingdom/somerset/taunton)
- [Cheapest charging in Taunton](https://ampmap.co.uk/chargers/united-kingdom/somerset/taunton/cheapest)
- [InstaVolt Ltd chargers](https://ampmap.co.uk/networks/instavolt-ltd)

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/instavolt-ltd-instavolt-route-303-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 5 Mar 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.