InstaVolt Ltd · EV charging site
K F C
Trench Lock, Wellington, TF1 6SZ
K F C is an EV charging site in Wellington, Telford and Wrekin, run by InstaVolt Ltd. Both of its sockets are 50 kW CHAdeMO and CCS, and the price is listed as £0.75/kWh. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Fallow Field, Hadley (Osprey Charging), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- InstaVolt Ltd
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.75/kWh(from Open Charge Map, 3 Mar 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at K F C (InstaVolt Ltd)?
The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at K F C (InstaVolt Ltd)?
Up to 50 kW DC via CHAdeMO, CCS.
How many charging sockets does K F C (InstaVolt Ltd) have?
2 charging sockets: 2 × 50 kW CHAdeMO, 2 × 50 kW CCS.
Who operates K F C?
K F C is on the InstaVolt Ltd network.
Where is the nearest other charger with 50 kW or more to K F C (InstaVolt Ltd)?
Fallow Field, Hadley (Osprey Charging) is 0.6 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at K F C (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at K F C (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at K F C (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fallow Field, Hadley
- Busch LTD - Telford
- EV-OG
- Pod Point Tesco Extra - Telford
- Boiler House Car park - The Princess Royal Hospital NHS
- ST James House, Telford
- Cheapest nearby
- Pod Point Tesco Extra - Telford · 44.4p per kWh · 50 kW · 1.6 mi
- Fastest nearby
- EV-OG · 360 kW · 1.5 mi