InstaVolt Ltd · EV charging site
Kirky Filling Station
80 Waterside Road, Kirkintilloch, G66 3HG
Kirky Filling Station is an EV charging site in Kirkintilloch, East Dunbartonshire, run by InstaVolt Ltd. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as £0.75/kWh. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Merkland Drive Kirkintilloch Glasgow (POGO), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- InstaVolt Ltd
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.75/kWh(from Open Charge Map, 3 Mar 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Kirky Filling Station (InstaVolt Ltd)?
The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Kirky Filling Station (InstaVolt Ltd)?
Up to 50 kW DC via CHAdeMO, CCS.
How many charging sockets does Kirky Filling Station (InstaVolt Ltd) have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Kirky Filling Station?
Kirky Filling Station is on the InstaVolt Ltd network.
Where is the nearest other charger with 50 kW or more to Kirky Filling Station (InstaVolt Ltd)?
Merkland Drive Kirkintilloch Glasgow (POGO) is 0.6 miles away in a straight line, with up to 200 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Kirky Filling Station (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Kirky Filling Station (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Kirky Filling Station (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Merkland Drive Kirkintilloch Glasgow
- Old Gatehouse, Lenzie
- Donaldson Street, Kirkintilloch
- Eastside, Kirkintilloch
- William Patrick Library, Kirkintilloch
- Lenzie Railway Station, Lenzie
- Cheapest nearby
- Merkland Drive Kirkintilloch Glasgow · 56p per kWh · 200 kW · 0.6 mi
- Fastest nearby
- Merkland Drive Kirkintilloch Glasgow · 200 kW · 0.6 mi