# M6 Corley North Instavolt Welcome Break · InstaVolt Ltd

Web page: https://ampmap.co.uk/charger/instavolt-ltd-m6-corley-north-instavolt-welcome-break-uk

M6 Corley North Instavolt Welcome Break is an EV charging site in Bedworth, Warwickshire, run by InstaVolt Ltd. All 8 of its sockets are 50 kW CCS, and the price is listed as £0.75/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** M6 Corley North Instavolt Welcome Break, CV7 8NR
- **Area:** Bedworth, Warwickshire, United Kingdom
- **Coordinates (latitude, longitude):** 52.47006, -1.54595

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 8 | Not listed |

- **Price:** £0.75/kWh (from Open Charge Map)

## Site information

- **Operator:** InstaVolt Ltd
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at M6 Corley North Instavolt Welcome Break (InstaVolt Ltd)?

The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at M6 Corley North Instavolt Welcome Break (InstaVolt Ltd)?

Up to 50 kW DC via CCS.

### How many charging sockets does M6 Corley North Instavolt Welcome Break (InstaVolt Ltd) have?

8 charging sockets: 8 × 50 kW CCS.

### Who operates M6 Corley North Instavolt Welcome Break?

M6 Corley North Instavolt Welcome Break is on the InstaVolt Ltd network.

### How long does a Tesla Model Y Long Range take to charge at M6 Corley North Instavolt Welcome Break (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at M6 Corley North Instavolt Welcome Break (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at M6 Corley North Instavolt Welcome Break (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Bedworth](https://ampmap.co.uk/chargers/united-kingdom/warwickshire/bedworth)
- [InstaVolt Ltd chargers](https://ampmap.co.uk/networks/instavolt-ltd)

## Chargers near this site

- [EH - Welcome Break Corley Northbound · GRIDSERVE](https://ampmap.co.uk/charger/electric-highway-welcome-break-corley-northbound-services-uk) - CCS 45 kW, CCS 40 kW · M6 Northbound Jct 3, 4 · From 92p/kWh
- [EH - Welcome Break Corley Southbound · GRIDSERVE](https://ampmap.co.uk/charger/gridserve-welcome-break-corley-southbound-services-uk) - CHAdeMO 50 kW, CCS 45 kW · M6 Southbound Jct 3, 4 · From 92p/kWh
- [Corley Services Southbound · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-corley-services-southbound-uk) - CCS 125 kW, CHAdeMO 63 kW · Corley Services
- [Rookery Lane 1 · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-rookery-lane-1-uk) - Type 2 7 kW · Rookery Lane
- [33 Parkville Highway · Char.gy](https://ampmap.co.uk/charger/char-gy-33-parkville-highway-uk) - Type 2 3 kW · 33 Parkville Highway
- [19 Parkville Highway · Char.gy](https://ampmap.co.uk/charger/char-gy-19-parkville-highway-uk) - Type 2 3 kW · 19 Parkville Highway

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/instavolt-ltd-m6-corley-north-instavolt-welcome-break-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 3 Mar 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
